TR9302-CS 910507 J~* ~'.'~' RO. ~× 47a
Copp~ll, Ta×a~ 7501§
The City With A Beautiful 214- 462- 0022
May 7, 1991
Mr. Dan Meadors
6600 Boucher Drive
Edmond, OK 73034
Dear Mr. Meadors:
The City of Coppell has awarded the contract for Traffic Signal
Installation (Denton Tap Road at Bethel Road) to Sig-op Systems, Inc. on
March 26, 1991.
We request preparation be made to expedite the contract to begin as soon
as possible.
The pre-construction meeting set for Friday, May 10, 1991 at 8:30 a.m. has
been rescheduled for Thursday, May 16, 1991 at 8:30 a.m. at the downstairs
conference room of Town Center, 255 Parkway Blvd., Coppell, Texas.
If you have any questions, please contact me at 214-393-1016.
Construction Inspector
CnD/bd
cc: Gary L. Sieb, Director of Planning and Community Services
M. Shohre Daneshmand, Acting City Engineer
Don Glen, Barton-Aschman Associates
Ben dela Cruz, Engineer Technician
Rey Gonzales, Street Superintendent
Howard Pafford, Water Superintendent
Glen Fabian, TU Electric
Scott Marpe', Lone Star Gas
Donnie Dunn, Paragon Cable