W Sandy Lk Addn-CS040804 T H E . C I T ¥ · O F COPPELL August4,2004 B. David Littleton, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Dallas, TX 75225 RE: West Sandy Lake Road Addition Fee Assessment Letter Dear Mr. Littleton: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $0.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Keith R. Marvin, P.E. Civil Engineer Jennifer Armstrong, Finance Director ~ary Beth Spletzer, Administrative Secretary, Building Inspections ~lenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation Project: Date: DEVELOPMENT FEE TABLE ~Vest Sandy Lake Road Addition 8/3/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $9,660.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $376.96 (100% due at Issuance of Water Meter) i Water Meter Fee (Irrigation/Fireline) $4,345.96 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,480.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (I 00% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (I 00% due prior to Acceptance of Project) ][ Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II TOTAL $19,542.92 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: West Sandy Lake RoadAddition DATE: 8/3/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 2 inch = 16 ESU's 2 - 2 inch = 16 ESU's / 0 = 0 ESU's 2 - 8 inch = 2.5 ESU's Total#: 34.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $188.48 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: 2 Irrigation Meter(s) @ $188.48 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $1,984.50 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $9,660.00 $300.00 $376.96 $376.96 $0.00 $3,969.00 $60.00 $120.00 $4,480.00 $100.00 $100.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $o.o0 $0.00 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U Electric submits the lighting plan for the proposed development, Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: West Sandy Lake Road Addition 8/3/2004 ROADWAY IMPACT FEE: §ervice Area * 1 Zategory ** Industrial Land Use ** General Light Industrial Building Area (sO 604,800 Development Units ** 604.80 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 ?~oadway Impact Fee due = (Development Units) x 'Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $192,326.40 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees I00% *** Total Credit $192,326.40 *** Credit granted in exchange for the dedication of 2.35 acres of land for drainage easement per development agreement Executed by the City Manager on March 30, 2004. DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIGINAT ON DATE: West Sandy Lake Rd Addition Halff Associates 8/4/2004 SENT 8/4/2004 ASSESSMENT ASSESSED FEE Water Impact Fee $9,660.00 Wastewater Impact Fee $4,480.00 Park Fee n/a Roadway Impact-Zone n/a Street Sign Street Light Construction Inspection $50,284.00 EG or Bore Permit Overtime Inspection Water Tap Inspection $300.00 Wastewater Tap Inspection $100.00 Water Meter (Domestic) $376.96 Water Meter (Fire/Irrig) $4,345.96 Meter Deposit (Domestic) $60.00 Meter Deposit (Fire/Irrig) $120.00 Utility Final Inspection $100.00 AMOUNT PAlE DATE $50,284.00 pjc 3/8/2005 $100.00 di 8/2/2005 $3,969.00 di 8/2/2005 $60.00 di 8/2/2005 ~Subtotal to Eng. TOTALS $50,284.00 $50,284.00 $0,00 Total Fees Fees Paid Amount Owed $69,826.92 $54,413.00 $15,413.92 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.