Loading...
ST0502B-CS051117Ken Griffin- RE: Freeport Parkway ~D-/" ~ ~ 0 2. ~ From: Ken Griffin To: June Lykes Date: 11/17/2005 9:51 AM Subject: RE: Freeport Parkway Mr. Lykes I've attached the preliminary conceptual layout for Freeport Parkway. This was provided by Freese and Nichols to assist in the preparation of their scope of services. It is preliminary and subject to adjustment based on several factors such as: discussions with the property owner, existing gas wells, existing gas transmission line, etc. There is some Federal funding proposed for this project, but the money becomes available in October 2007. The City hopes to fund the design and have the design complete by that time. Because of the partial Federal funding, there will be an environmental study required. These studies sometimes take years to complete, so it could be the controlling factor in the timetable for the start of construction. I hope this information is helpful. If you have any additional questions please feel free to contact me at your convenience. Ken Griffin, P. E. Director of Engineering/Public Works 972-304-3686 kgri ffln~(~ci .~co~pell .tx .us