Pecan Hollow Add-CS 910508The City With A Beautiful Future
May 8, 1991 ~
Mr. Doyle Cameron / ~'
Camero Development
16250 Dallas Parkway, Suite 200 ,~
Dallas, TX 75248 ~
Dear Mr. Cameron:~
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
A final inspection of the above referenced project has been confirmed by
representatives of the City of Coppell and the Municipal Utility District.
Paving and utilities have been verified and are in compliance with the
City of Coppell standard requirements. Utilities have also been accepted
by the Municipal Utility District #1.
The one-year maintenance bonds and as-built drawings have been received
from the contractor. Maturity on the bonds will be one year from the date
of this letter (May 8, 1991).
Construction Inspector
CLD/bd
cc:
M. Shohre Daneshmand, Acting City Engineer
Gary L. Sieb, Director of Planning and Community Services
Howard Pafford, Water Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation ManaGer
Taryon Bowman, P&Z Coordinator
Ben dela Cruz, Engineer Technician
Ron Davis, J. D. Abrams Construction
Jeff Hawkins, M.U.D.
Dale Gilreath, Glenn Thurman, Inc.
PECFINAL