Pecan Hollow Add-CS 910501COPPELL PUBLIC ~ORKS
MEMORAN~JM
DATE:
TO:
FROM:
1, 1991
La Davis,
Pecan Hollow
Construction Inspector
Streets Superintendent
Walk Thru
317 Lodge Road - Repour block out at alley corner, by power
pole.
On north end of project at all dralnage easements, 36", the two
(2) 60" and 5' x 2' box head wall - grade around. (dirt work)
On south side of project need to put erosion control or plug
on 6' x 3' box, also need line B-3 or concrete wrap around these
areas.
Cedar Ridge Drive and Dogwood Trail - Pour valve stack at south
west corner.
Seal all saw joints and redwood headers to within 1/8" of
the street surface.
- Question: Where is the water to go on Lodge Road, there are
no drop inlets.
RG/mp
cc: Steven G. Goram, Director of Public Works
PEC~/qHW.RG