Loading...
Pecan Hollow Add-CS 910501COPPELL PUBLIC ~ORKS MEMORAN~JM DATE: TO: FROM: 1, 1991 La Davis, Pecan Hollow Construction Inspector Streets Superintendent Walk Thru 317 Lodge Road - Repour block out at alley corner, by power pole. On north end of project at all dralnage easements, 36", the two (2) 60" and 5' x 2' box head wall - grade around. (dirt work) On south side of project need to put erosion control or plug on 6' x 3' box, also need line B-3 or concrete wrap around these areas. Cedar Ridge Drive and Dogwood Trail - Pour valve stack at south west corner. Seal all saw joints and redwood headers to within 1/8" of the street surface. - Question: Where is the water to go on Lodge Road, there are no drop inlets. RG/mp cc: Steven G. Goram, Director of Public Works PEC~/qHW.RG