Loading...
Pecan Hollow Add-CS 900614GINN, INC. CONSULTING ENGINEERS Date: To: From: Re: PLAT/PLAN REVIEW MEMORANDUM _ / ./~/ June 14, 1990 Steven G. Goram, Dire. ctor City of Coppell Public Works Department~ · John C. Karlsruher, P.E. Review Co~e~ fn~ ~h~al Plat and ~ngineering Plans - ow 1 - 4th Review FINAL PLAT: 1. Clarify note regarding fill and finished floor elevations. PAVING PLANS: Sheet 13/22 - traffic buttons should be used to channelize south bound traffic on Lodge Rd. at asphalt transition as indicated on plan. 2. Typical street curb return radii need to be indicated on plans. 3. Barrier free ramps should be used at all street crossings and alley crossings of sidewalks. DRAINAGE PLANS: Drainage Map does not indicate the handling of runoff in west ditch of Lodge Rd. coming from the south. Please indicate how this runoff will be handled. Portions of the lots in Block B surface drain to the ABQ property to the west. According to existing topography this changes the drainage pattern, and ABQ's acknowledgment and permission are required to treat runoff from this subdivision in the proposed manner. Sheet 2/7 - 1' minimum clearance must be provided between the 8" sanitary sewer and the 36" RCP storm sewer at Station 1+28. Sheet 3/7 - the laterals in Beechwood Ln. which tie into line "B" must enter line "B" pointing downstream. Sheet 4/7 - in lieu of the junction box requested on line "B" at Station 13+70 +/- during the previous review, manhole risers may be constructed providing maintenance access to both barrels of the double box culvert. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 (continued) Also, provide some means of restricting access to the large openings of the special inlets at the south property line to small children. 5. Label line "B". 6. Sheet 6/7 and 7/7 - the hydraulic gradients on lines "C" and "C-2" are too high. Please revise. Line "C-2" must enter line "C" at an angle pointing downstream Gifford-Hill C-76 B-2, or B-3 radius pipe (or equal) must be specified for the curved portions of the line as marked on the drawings. LOT/SUBGRADE PREPARATION PLANS: Lot Grading Plan Sheet 3/4 - due the change in the existing drainage pattern for the lots in Block B, acknowledgment of and permission for the revised drainage onto ABQ property must be obtained prior to approval of plans. WATER AND SEWER PLANS: 1. Ail storm sewer crossings of the Sanitary Sewer lines must be shown on the profiles. The Water and Sanitary Sewer Plan must be revised as marked adding and relocating valves, blowoffs, and connecting to the existing water system as marked. LANDSCAPE PLANS: 1. No revised plans received for review at this time. The Engineer, by copy of this memorandum is directed to comply with the review comments and resubmit his corrected plans with the marked up plans representing the review comments contained herein. For questions regarding comments made by Public Works or Engineering Department staff contact the following: 1. Water and Sewer at 214-462-8495. Water Superintendent, Mr. Howard Pafford, 2. Streets - Streets Superintendent, Mr. Per Birdsall, at 214- 462-8495. 3. Parks - Parks Superintendent at 214-462-8495. 4. Engineering - John C. Karlsruher, P.E., Ginn, Inc. Consulting Engineers at 214-248-4900. ·FEES DUE: Water and Sewer Availability Fee @ $440/unit 1/2 due prior to City Council consideration 202 lots x $440/lot = $88,880.00 1/2 = $44,440.00 due now Water Tap Fee @ $100/meter Due prior to issue of building permits 202 lots x $100/lot = $20,200.00 Sewer Connection Fee ~ $100/sewer connection 100% due prior to issue of buildiug permits 202 lots x $100/lot = $20,200.00 D. Construction Permit Fee First deposit @ $500-~ $20/lot = $500-~ $20 x 202 = $4,540.00 due now Second deposit in an amount equal to 1.5% of the estimated construction cost of the items proposed to be dedicated to the City. This is due prior to issuance of a construction permit. Park Fund @ $150/SF borne 100% due prior to final plat approval 202 lots x $150/lot = $30,300.00 Street Light Fee @ $292.60 per light for every 200 feet of roadway. This fee is due pr]or to final acceptance of the subdivisio~]. Review with Coppell Public Works Street Department. Street Sign Fee as required by the accordance with attached guidelines. permits being issued. Review with Street Department. Street Department in Due prior to building Coppell Public Works TOTAL OF FEES DUE AT THIS TIME = $'79,280.00 Should there be further questions on policy or disputes which may need to be resolved, please contact Mr. Steve Goram, Director of Public Works, at 214-462-8495. cc: Gary Sieb William Anderson, Dan M. Dowdey & Assoc., Inc., w/marked plans