Loading...
Denton Tap 1A-LR0512054950 Keller Springs RoM, Suite 480 Addison, TX 75001 (972) 392-3222 (FAX) 392~)I02 CONCRETE, GROUT, AND MORTAR TESTS LETTER OF TRANSMITTAL TO: Little Diversified Arch. Consulting 5001 Spring Valley Road, Suite 282-W Providence Towers Dallas, TX 75244 ATTN: Ms. Kathryn E. Rabuse JOB NO.: 004236A DATE: 12/05/2005 RE: ~oppell PERMIT #: LOCATION: 131 N. Denton Tapp Road, Coppell, TX Dallas County County We are enclosing: X Attached X Materials Engineering Division Concrete Reports: 13 X For Your Use X As Requested CC: Centex Construction Co. - Claud Bolton Centex Construction Co. - Robert Boe Wachovia Corporate Real Estate - Ken Clausen Little Diversified Arch. Consultants - Philip F. Ritchie City ofCoppell - Lee Stone City ofCoppell - Larry Davis Little Diversified Arch. Consulting - Jaime Nenclares By: ~_~~__~~/ Jaso l~~'/A/~-~ pDrea~ii~tlenF[~rkilni~} pP~l~ n ginee r ~io-n-Services Manager Addison,TX 75001 (972) 392-3222 (FAX) 392-0102 Project: Wachovia - Coppell Location: 131 N. Denton Tapp Road, Coppell, TX Concrete Cylinders Strength Report Project: 4236-A Set Designation: A Cast Date: 11/28/2005 Design Strength: 3500 psi Report No.: 13 Owner: Wachovia Corporate Real Estate - Ken Client: Little Diversified Arch. Consultants - Arch.: Little Diversified Arch. Consulting - Jaime Gen. Contr.: Centex Construction Co. - Struc. Eng.: Conc. Contr.: Placement Location: Light pole base, SE comer of parking lot. Concrete Supplier: Southern Star Truck No: 522 Ticket No: 831916 Mix Designation: 9337 Mix Strength:3500 psi Batch Time: 03:11PM Added Water: Time Added: Unit Wt.: FIELD TEST DATA: Tested by: John G. Zimont Time Sampled:03:50PM Slump: 3.00 in. Temperature - Air: 65° F Concrete: 70° F Air Content:3.00 % (p) Sample Test Test Type Diameter Area Breaking Compr. Brk Break Review No Date Age Cure In. In? Load, lbs Str.,psi Typ by by 24092 12/05/2005 7 Lab 6.00 28.27 116896 4130 JBA1 24093 12/26/2005 28 Lab 6.00 28.27 24094 12/26/2005 28 Lab 6.00 28.27 24095 sp Lab 6.00 28.27 Sampling in accordance with (iaw) ASTM C172, except that samples may have been take~ from the b~ inning of the load aftE minimum discharge of approximately ~ne cubic yard. Cylinder molding and laborato~ cudng iaw ASTM C31, compressive streng63 test and break [ype iaw ASTM C39, slump iaw C143, air contenl iaw ASTM C173 (V) or C231 (P), temperature iaw ASTM C1064, and unit weight iaw ASTM C138. Cylinders are tested using unbonded caps iaw ASTM C1231 or are capped using sulphur mortar iaw C617. Break Types are classified as: Type 1, 2, 3, 4, 5, or 6 iaw C39-04a FIELD CURING CONDITIONS: Curing Box Insulated Cooled Ice X No CuringBox Heated X Caps Other Remarks: Final Review By: JBA 1 Print Date: 12/05/2005