Loading...
Denton Tap 1A-LR051130ECS - Texas, LLP 4950 Keller Springs Rood, Suite 480 Addison,TX 75001 (972) 392-3222 (FAX) 392-0102 5001 Spring Valley Road, Suite 282-W CONCRETE, GROUT, AND MORTAR TESTS LETTER OF TRANSMITTAL DATE: 11/30/2005 RE: Wachov~il TO: Little Diversified Arch. Consulting Providence Towers Dallas, TX 75244 ATTN: Ms. Kathryn E. Rabuse JOB NO.: 004236A PERMIT #: LOCATION: 131 N. Denton Tapp Road, Coppell, TX Dallas County County We are enclosing: X Attached X Materials Engineering Division Concrete Reports: 5,6 X For Your Use X As Requested NOTE: LOW TEST RESULTS REPORTS 5, 6 City ofCoppell - Lee Stone City ofCoppell - Larry Davis Little Diversified Arch. Consulting - Jaime Nencl[e~ CC: Centex Construction Co. - Claud Bolton Centex Construction Co. - Robert Boe Wachovia Corporate Real Estate - Ken Clausen Little Diversified Arch. Consultants - Philip F. By: Daniel Franklin, P.E. President/Principal Engineer Jasor~j~l'~n,-Sl~T C~uction Services Manager  4950 Keller Springs Road, Suite 480 Addison,TX 75001 (972) 392-3222 (FAX) 392-0102 Project: Wachovia - Coppell Location: 131 N. Denton Tapp Road, Coppell, TX Concrete Cylinders Strength Report Project: 4236-A Set Designation: A Cast Date: 11/02/2005 Design Strength: 5000 psi Report No.: 5 Owner: Wachovia Corporate Real Estate - Ken Arch.: Little Diversified Arch. Consulting - Jaime Struc. Eng.: Client: Little Diversified Arch. Consultants - Gen. Contr.: Centex Construction Co. - Conc. Contr.: Placement Location: Slab-on-grade, sampled at 15'S/5'E of NW vault comer. Concrete Supplier: Southern Star Truck No: 948 Ticket No: 943133 Mix Designation: 7522 Mix Strength: 5000 psi Batch Time: 09:05AM Added Water: 10 Gals. Time Added: 10:05A Unit Wt.: FIELD TEST DATA: Tested by:Louis J. DeRossi Time Sampled:10:10AM Slump:6.00 in. Temperature - Air: 62° F Concrete: 69° F Air Content:l.50 % (p) Sample Test Test Type oi,~et~ Area Breaking Compr. Brk Break Review No Date Age Cure In. In.2 Load,lbs Str.,psi Typ by by 23753 11/09/2005 7 Lab 6.00 28.27 98528 3480 JBA1 23754 11/30/2005 28 Lab 6.00 28.27 121312 4290 3 JBA1 23755 11/30/2005 28 Lab 6.00 28.27 120384 4260 3 JBA1 23756 12/28/2005 56 Lab 6.00 28.27 Sampling Cylinder melding and laborato~ cudng law ASTM C31, compressive slre~gth test and break type law ASTM C39, slump iaw Ct 43, air content iaw ASTM C173 (V) or C231 (P), temperature law ASTM C1064, and unit weight law ASTM C138. Cylinders are tested usiag unboaded caps law ASTM Cl 231 or are capped using sulphur mortar iaw C617. Break Types are classified as: Type 1,2, 3, 4, 5, or 6 iaw C39-04a FIELD CUR1NG CONDITIONS: Curing Box Insulated X No Curing Box Heated Remarks: Hold Cylinder Set for 56 day break Cooled Ice X Caps Other Final Review By: ' Ii TE: I. SW TEST IF. SILTS JBA1 Print Date: 11/30/2005 ~ ECS - Texas, LLP 4950 Kc[[er Springs Road, Suite 480 Addison, TX 75001 (972) 392-3222 (FAX) 392-0102 Project: Wachovia - Coppell Location: 131 N. Denton Tapp Road, Coppell, TX Concrete Cylinders Strength Report Project: 4236-A Set Designation: B Cast Date: 11/02/2005 Design Strength: 4000 psi Report No.: 6 Owner: Wachovia Corporate Real Estate - Ken Client: Little Diversified Arch. Consultants - Arch.: Little Diversified Arch. Consulting - Jaime Gen. Contr.: Centex Construction Co. - Struc. Eng.: Conc. Contr.: Placement Location: slab-on-grade, sampled at 40'E/5'S of NW comer of slab. Concrete Supplier: Southern Star Truck No: 8873 Ticket No: 943139 Mix Designation: 9349 Mix Strength: 4000 psi Batch Time: 09:30AM Added Water: 10 Gals. Time Added: 10:25A Unit Wt.: FIELD TEST DATA: Tested by:Louis J. DeRossi Time Sampled:l 0:30AM Slump:ZOO in. Temperature - Air: 65° F Concrete: 70° F Air Content:1.00 % (P) Sample Test Test Type Diameter Area Breaking Compr.. Brk Break Review No Date Age Cure In. In.2 Load,lbs Str.,psl Typ by by 23757 11/09/2005 7 Lab 6.00 28.27 79872 2820 JBA 1 23758 11/30/2005 28 Lab 6.00 28.27 107872 3820 5 JBA1 23759 11/30/2005 28 Lab 6.00 28.27 108352 3830 5 JBA1 23760 12/28/2005 56 Lab 6.00 28.27 ;amDItae in accordance with flaw) ASTM C172, exceet that samptas may have been taken from the beginning of the load after a minimum discharge of approximately one cubic yard. Cylinder molding and laborata~7 cud~g law ASTM C31, compressive sb-ength test and break type law ASTM C39, slump law C143, air content law ASTM C173 (V} or C231 (P), temperature iaw ASTM C1064, and unit weight law ASTM C138. Cylinders are tested using unbonded caps law ASTM C1231 or are capped using sulphur mortar law C617. Break Types are classified as: Type 1, 2, 3, 4, 5, or 6 iaw C39-04a FIELD CURING CONDITIONS: Curing Box Insulated X No Curing Box Heated Remarks: Hold cylinder set for 56 day break Cooled Ice X Caps Other Final Review By: __ lITE: I,eW TEST IIESIILTS JBA1 Print Date: 11/30/2005