Loading...
ST9302-CS 930712To: From: MEMORANDUM Kenneth M. Griffin, P.E., City Engineer Doug Stevens, Engineering Technician RE: Plans of Sandy Lake for Rady & Associates Date: July 12, 1993 Robert Maiy of Rady & Associates called my office on Friday, July 9,1993 and requested that I make available to him the full size sets of plans along Sandy Lake Road. For the record, these are the plans that are to be checked out: Enpineerine 307 Sandy Lake Plaza (Lot 4, Blk. 1) 314 Sand Pointe Estates 515 Park Place Addition 516 Pecan Ridge 806 Highland Meadows 807 Heartz/Vanbebber Road Improvements 808 Highland Oaks 809 Hearts Road (Sandy Lake to Parkway) 1114 Chaucer Estates Public Works A-3 Woodridge Section One AA-3 Moore Road Improvements L-2 Meadows Section II C-15 Town Oak Centre C-30 Sandy Lake Addition G-1 Georgetown Plaza I-2 Braewood West 1-13 Sandy Oaks N-17 Woodridge Section Two N-18 Meadows I R-9 Moore Road North B-1 North Lake Woodlands East Phase II Additional Plans Included for Use Aerials, Topography, Water, Sewer, and Storm Drainage Maps (Section C-3, C-4, D-3 & D-4 ea.) Proposed Moore Road Drainage Improvements cc: Steve Goram f:x..\memo\sandla I