Park West CC(02-2)-LR051123 (2)GEOTECHNICALAND G R D I I p
ENVIRON~IENTAL CONSULTANTS
CONCR~EPORT
~t C.o mm, e.r.c_,e. __C_ e..n !e r
/ BeltlineRoadand_Airline Road
~ Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Ddve, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
Location of Sample
· et Number I Location
Paving: 160'S, 25'E of SE corner of Bldg. A
Paving: 400'S, 10'E of SE corner of Bldg. A
Paving: 70'S, 20'W of NW corner of Bldg. A
Design Information
Source of Concrete I Mix Identification I
TXI 8205
REPORT NO. 152
REG PROJECT NO. 12468
SAMPLE DATE: 11-16-05
TECHNICIAN: M. Wood
PAGE: 1 of 2
Quantity Represented
20/320
110/320
210/320
Specified Strength p.s.i.
4000
Test Results
Sst Cylinder Age Q Total Load
No. ID Date Tested Test lbs.
98850
1 6013 11-23-05 7
6013 12-14-05 28
6013 12-14-05 28
6013 Hold H
Compressive Average
Strength p.s.i. Strength p,s.i.
3500
2
3
6014 11-23-05 7 62950
6014 12-14-05 28
6014 12-14-05~
6014 Hold
6015 11-23-05
6015 12-14-05
6015 12-14-05
6015 Hold
2230
2540
24245TUTZ DR. · SUITE400 · DALLAS, TX75235 * TEL [214] 3505(500 · F^X [214] 3500017
REPORT NO. 152
REG PROJECTNO. 12468
SAMPLE DATE: 11-16-05
PAGE: 2 of 2
Cylinder Data
NS~ Cylinder Time ofI
ID Slump Sample Air Temp.
i 5013 5.5 5:30AM 34
6014 6.5 9:00AM 38
6015 5.0 10:50AM 40
Concrete Air Ticket
Temp. Entrainment Number
55 NA 156741
58 NA 156955
59 NA 157137
Mail
Dlsl~rlbutlon: (1) Cadence McShane Corporation/
Mr. Bobby Paret
(1) Commerce Construction Co., LP/
Mr. Rick Wyly
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Arthur Etherly, III
Manager, CMT
AE/Inc