Parkwood-CS 830614HOGAN Engineers · Planners · (~onsuItants June 14, 1983 Mr. Ron Ragland City Manager P. O. BOx 478 Coppell, Texas 75019 Re: Parkwood, Section One; Sherwood Park, Section One; and Paving and Drainage Improvements on Parkway Boulevard and Moore Road Dear Mr. Ragland: This will confirm meetings held in our offices on Friday, June 10, 1983, concerning the above referenced proposed subdivisions. Those in attendance were you and Mr. Scott Barnett of the City of Coppell, four representatives of the developers and builders, Messrs. Threadgill and Dowdey of Threadgill-Dowdey & Associates, Consulting Engineers, and several members of our firm. All items of platting and engineering have now been resolved in principle in accordance with the comments listed in our letters to the City, dated June 1, 1983, with the following additional comments. Parkwood, Section One No plans have been prepared for the paving of De Forest Road along the east side of this subdivision. It is our understanding that the developer has deposited his pro rata share of the paving costs for this roadway in lieu of paving at this time. If not, then plans should be made to permanently pave this street at this time. An easement will be dedicated along the west side of this subdivision for ingress to the earthen channel for maintenance. When the next section of this subdivision is developed, then this easement will be abandoned and an alley will be dedicated in its place. A concrete lining will be constructed in the bottom of the proposed drainage channel to maintain a smooth grade and to serve as a pilot channel during low flows. Suite 800 One Galleria Tower 13355 Noel ~loed 214/392-4600 Dallas, Texas 75240 e Thickened edges or curbs will be constructed on each side of the alley paving to provide sufficient capacity to carry the storm water run-off. An easement and improvements will be provided for discharge of storm water northward from the proposed channel. Sherwood Park, Section One The developer proposes to construct a concrete pavement 36 feet wide, face to face of curbs, in 50 feet of right-of-way on Lodge Road from Parkway Boulevard to the Freeman property. From the Freeman property southward to the south end of the proposed subdivision, the subdivider proposes to pave one-half of Lodge Road with 18 feet of reinforced concrete, measured from the street centerline to face of curb, in a 25-foot right-of-way dedication. An easement and improvements will be provided to convey the storm water from the proposed pipes under Moore Road to the proposed multiple box culvert under Parkway Boulevard. ® An easement and improvements will be provided for discharge of the storm water from the proposed pipe line at the intersection of Parkway Boulevard and Lodge Road. e Thickened edges or curbs will be constructed on each side of the alley paving to provide sufficient capacity to carry the storm water run-off. 5. It was agreed that the thickness of the concrete in the lined channel would be five (5) inches. Since this subdivision is being developed in sections, two (2) long water lines in Lodge Road and Plumlee Place.will be dead-end lines initially and will have no cross-connections for circulation. We recommend that these lines be cross-connected with a 6-inch main initially or that assurances be received from the subdivider that he will construct the main within one year if the next sections of the subdivision are not developed by that time. Paving and Drainage Improvements on Parkway Boulevard and Moore Road The subdivider proposes to pave Parkway Boulevard from Denton Tap Road to Heartz Road with two 24-foot lanes on each side with a 15-foot curbed median in 88 feet of right-of-way. This section will provide four traffic lanes as well as controlled access to abutting properties with left turn lanes. Also, this pavement section will be 8-inch thick 3,500 p.s.i, concrete because of anticipated commmercial development in this area. In addition a 16-inch water main will be constructed in this section of roadway; such main will connect to the proposed 16-inch water main to be constructed in Denton Tap Road from Sandy Lake Road to Parkway Boulevard. -2- 2. On Parkway Boulevard from Heartz Road to Lodge Road, the subdivider proposes a 22-foot pavement section on the south half of the street, with provisions being made for a future curbed median in the center of the street. This construction will be in an 88-foot right-of-way. 3. From Lodge Road to Moore Road, the pavement section on Parkway Boulevard will be one-half of a 44-foot roadway (on the south side) in 60 feet of right-of-way. 4. A pavement width of 44 feet, face to face of curbs, is proposed to be constructed on Parkway Boulevard in 60 feet of right-of-way from Moore Road to De Forest Road. 5. A 16-inch water main is proposed to be installed in Parkway Boulevard from Lodge Road to De Forest Road. 6. EasementS and improvements will be provided northward from the proposed drainage structures under Parkway Boulevard in order to convey the storm water run-off. As a result of our subsequent conversations with the subdivider's consulting engineers, all other suggested corrections and changes have either been made or agreed to. We therefore recommend that these subdivisions be approved, subject to the items listed above. Your very truly, HOGAN & RASOR, INC. Robert E. Hog President -3-