Loading...
ST9302-CS 930201 Fu,ure FEB 02 1993 The City With A Beautiful {~.!~ ~!!!.3~ PUBLIC WORKS P,O. Box 478 Coppell, Texas 75019 214-462-0022 February 1, 1993 Graham Associates, Inc. Centerpointe Two, Suite 400 616 Six Flags Drive Arlington, TX 76011 Re: Proposal for Engineering Design Associated With Sandy Lake Road From MacArthur Blvd. to Denton Tap Road Attached to this letter is a copy of the Scope of Services for the design of Sandy Lake Road from MacArthur Boulevard to Denton Tap Road. This Scope of Services enumerates the essential elements that the City will be evaluating prior to selecting a firm to negotiate a contract with. Five conies of the nrooosal should be submitted to and received by the En~.ineerim, Department no later than 5:00 o.m., Friday, March 26, 1993. The actual review of the proposals and the selection of the firms will be conducted during the timeframe of March 29, 1993 through April 16, 1993. If the selection process stays on schedule, the contract for the design of Sandy lake Road will be awarded to a consultant at the April 27, 1993 City Council meeting. As I am sure you are aware, the proposal should contain no information relative to the cost for the design of this project. All cost information will be negotiated with the consulting engineering firm that, in the City's opinion, will provide the best service to the City in the design of the project. If the City cannot negotiate a contract with that firm, then we will move to the next qualified, and so forth until a negotiated contract can be arrived at. The City has very limited information available on Sandy Lake Road. However, we do have some information on the subdivisions that abut Sandy Lake Road. The City would be happy to share and/or provide any information at your convenience. The initial contact person for theacquisition of any information is Doug Stevens, Engineering Technician. However, if I can provide you any information during the process of putting together your proposal, please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. City Engineer Alan D. Ratliff, City Manager [~teve Goram, Director of Public Works Gary Sieb, Director Planning & Community Service Frank Trando, Finance Director/Deputy City Manager Jim Ragsdill, Purchasing Agent Doug Stevens, Engineering Technician SCOPE OF SERVICES FOR THE DESIGN OF SANDY LAKE ROAD FROM MACARTHUR TO DENTON TAP The City of Coppell is seeking proposals for the engineering design associated with Sandy Lake Road from MacArthur to Denton Tap. The proposal should contain, but not be limited to, the following information: 1) 2) 3) 4) 5) A summary of the essential elements of the proposal, including a completion schedule for each element. The technical approach to accomplish the objectives for the assignment. The related experience of the consultant and the personnel assigned to the project. A management plan, including identification of the project manager and key personnel assigned to the project. Background information on the people that will be working on the project should be included. A list and status of current activity in the City. The list should include all public or private work within the last year and the last public or private project ever in Coppell, regardless of when it was designed. Project Information: Sandy Lake Road will be constructed as a four-lane divided roadway in six lanes of right-of- way. Them are extensive drainage considerations along this project, most notably at the east end near MacArthur and near the intersection of Moore Road and Sandy Lake. The vertical grade will need to match several existing streets and the horizonal alignment will need to take into consideration existing right-of-way. In conjunction with the street construction, the City will be constructing a 24" water transmission line. The design and location of the water line will be an integral part of the design of Sandy Lake Road. It is anticipated that the water line plans will be completed first, after the preliminary design, so that the construction of the water line can begin prior to the construction of the street. There will need to be coordination with existing water lines and gas lines and other utilities in Sandy Lake Road and any other utilities that may exist. A schematic layout of Sandy Lake Road, with the existing adjacent development and right-of-way, is included for your review. You should contact the Engineering Department to evaluate any available information. SCOPE OF SERVICES FOR THE DESIGN OF SANDY LAKE ROAD FROM MACARTHUR TO DENTON TAP Page 2 The scope of the work will be as follows: 1) 2) 3) 4) 3) 4) 5) 6) Obtain and utilize all existing data. Perform all necessary field surveys to accomplish the required design of the project. This will include establishment of vertical and horizontal control. Obtain soil borings and determine soil conditions at specific locations along the proposed route. Prepare cost estimates for the project. Design and prepare construction drawings and specifications for the project. Prepare all necessary documents for right of way acquisition. Assist in the preconstruction bidding, review, and award of a construction contract. Upon completion of the project, provide a set of reproducible as-built drawings. The Evaluation Criteria: All proposals will be thoroughly evaluated by the City, after which negotiations will be initiated with the City's first choice. If negotiations fail to produce an agreement, negotiations will cease and the City's second choice will be notified and so on, until the City can come to an agreement with an acceptable consultant. The contract will be awarded to the responsible firm whose proposal is determined to be the most advantageous to the City considering, but not limited to, the following factors: 1) 2) 3) 4) 5) 6) Understanding of the project. Ability to complete the project in a timely manner. Qualifications of personnel assigned to the project. The type of services proposed. The firm's prior experience with projects of this type. The City's past experience with the firm. LISTING OF FIRMS PROVIDED INFORMATION ON THE PROPOSALS FOR THE DESIGN OF SANDY LAKE ROAD FROM MACARTHUR BLVD. TO DENTON TAP RD. Graham Associates, Inc. Centerpointe Two, Suite 400 616 Six Flags Drive Arlington, TX 76011 Carter & Burgess, Inc. 7950 Elmbrook Drive Suite 250 Dallas, TX 75247-4951 Shimek, Jacobs & Finklea 8333 Douglas Avenue, #820 Dallas, TX 75225 Sverdrup Corporation 4311 Oak Lawn, Suite 300 Dallas, TX 75219 HDR Engineering, Inc. 12700 Hillcrest Rd., Suite 125 Dallas, TX 75230-2096 Binkley & Barfield, Inc. 12860 Hillcrest Rd. Suite 222A Dallas, TX 75230 Huitt-Zollars, Inc. 3131 McKinney Avenue Suite 600 Dallas, TX 75204 MSQ Engineering, Inc. 5495 Beltline Rd. Suite 380 Dallas, TX 75240 Kimley-Hom & Associates, Inc. 12660 Coit Road Suite 200 Dallas, TX 75251 Teague Nall& Perkins 220 W. Irving Blvd., Suite 2 Irving, TX 75060 Rady & Associates, Inc. 910 Collier Street Ft. Worth, TX 76102 NRS Consulting Engineers 11500 Stemmons Freeway Suite 172 Dallas, TX 75229 JBM Consulting Engineers 15400 Knoll Trail Suite 111 Dallas, TX 75248 The Ginn Corporation 17103 Preston Road Suite 205 Dallas, TX 75248 Lichliter/Jameson & Associates, Inc. 1420 W. Mockingbird Lane Suite 300 Dallas, TX 75247-4906 Lockwood, Andrews & Newman, Inc. 4521 S. Hulen Street Suite 104 Ft. Worth, TX 76109 Weir & Associates 4300 Beltway Place Suite 130 Arlington, TX 76018