Loading...
Pecan Valley-AG 910514Cmsiderati~n a~l aplroval of a final plat 600 feet ncwth of Sandy Lake Road alnng the Gateway P~rtnewshil~ REQUEST FORM STAFF REP.: Gary 1... Sieb, Planning Director OTHER REP.: DATE: Date of pl~n.~n2 & Zo"~n?. Meeting: April 18, 1991 Decision of pln.uiu~ & Zc~nln~o Commission: Aplroved (6-0) with the follow~ cmnditim~ 1) tlmt the ownew procm~ the ri~ht-of-way fcw Lodge Road. BUDGET AMT. AMT 4-/- BUDGET N/A LEGAL REVIEW BY: REVIEWED BY CM: ~~ CITY OF COPPELL PLAITING DEPARTIiENT STAFF REPORT PECAN VALLEY ESTATES ADDITION - FINAL PLAT P & Z HE~RING DATE: April 18, 1991 C. C. ~ING DATE: M~y 14, 1991 LOCATION: Approximately 600 feet north of Sandy Lake Road, along the east side of Lodge Road. SIZE OF AREA: 16.233 Acres; 52 lots Approval of a final plat. APPLICANT: Mr. Ron Fraze Everfine/Gateway Partnership 10751Mapleridge Drive Dallas, Texas 75238 (214) 349-4095 Engineer, Bill Anderson Dan Do~dey &Associates 16250 Dallas Par]may Suite #100 Dallas, Texas 75248 (214) 931-0694 HISTORY: This property was recently rezoned from SF-12 to a PD for single-family develol~.nt, to contain a ~avimm of lots. 52 TRANSPORTATION: Lodge Road is projected to contain 50' of right-of-way within t~o travel lanes (27'), it is under construction, nearing completion just north of this request. Sandy Lake Road is projected to be a four lane divided road in a six lane divided right-of-way (110').. SURROtI~I)ING LAND USE i ZONING: North - PD single-family under.construction East - PD single-family vacant & SF-12 with scattered develop~nt South - SF-12 & P1)-SF-7 develoI~d West - SF-12 COtiPP~SIVE PLMI: The Comprehensive Plan shmm lo~ density develolz~ent as ~ost appropriate for this area. single-family ITEM 11 M;ALYSlS: If the conditions outlined for approval of Pecan Ridge are followed, staff would recommend approval of this final plat application. A~TERNATIVES: 1) Approve the final plat. 2) Deny the final plat. ATTACHMENTS: 1) Final Plat Document PVLYS?F