Pecan Valley-CS 920506May 6, 1992
Mr. Bill Anderson
Dan M. Dowdey & Associates
16250 Dallas Parkway, Suite 100
Dallas. TX 75248-2684
Re: Pecan Valley
Final Acceptance
Dear Mr. Anderson:
A final inspection of the above referenced project has been confirmed by
representatives of the City of Coppell.
The drainage utility has been verified and is in compliance with the City
of Coppell standard requirements. Erosion protection will also be
maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received
from the contractor. Maturity on the bonds will be one year from the date
of this letter (May 6, 1992).
Sincerely,
Larry Davis
Engineering Development Inspector
CLD/bd
cc:
Kenneth M. Griffin, P.E., City Engineer
M. Shohre Daneshmand, Civil Engineer
Howard Pafford, Water Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
Taryon Bowman, P&Z Coordinator
Dale Jackson, Building Official