Loading...
Pecan Valley-CS 920506May 6, 1992 Mr. Bill Anderson Dan M. Dowdey & Associates 16250 Dallas Parkway, Suite 100 Dallas. TX 75248-2684 Re: Pecan Valley Final Acceptance Dear Mr. Anderson: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. The drainage utility has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (May 6, 1992). Sincerely, Larry Davis Engineering Development Inspector CLD/bd cc: Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer Howard Pafford, Water Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Taryon Bowman, P&Z Coordinator Dale Jackson, Building Official PVFIN