Loading...
WA9801-CS 990826 (2)SHIMEK, JACOBS & FINKI,EA, L.L.P. CONSULTING ENGINEERS 8333 DouglasAvenue,#820 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 August 26, 1999 Transmitted Via Facsimile Mr. Jesse Vickers GTE Network Services 540 . Elm Street Lewisville, Tx 75067 Re: City of Coppell State Highway 121 Water Line Dear Mr. Vickers: In our meeting with you, Mr. Gary Casteel of GTE, and Mr. Larry Davis of the City of Coppell on July 21, 1999, we understood GTE was to proceed with the relocation of the underground communication cable in the areas in conflict with the proposed City of Coppell water line along State Highway 121 (See the attached memorandum dated July 30, 1999). As outlined in the July 30th memorandum, the City of Coppell has a permit fi'om the Texas Department of Transportation for the construction of this water line within the State's right-of-way. The City's water line was permitted for a distance of 10-feet off the right-of-way line and the project alignment was set using the state's right-of-way markers and right-of-way strip map (not the fence lines or tree line). It is very likely that the permit issued to GTE by Texas Department of Transportation provides for a specific location of your facility also. We suggest you review the permit and determine if your communication line was constructed in accordance with the permit issued by TxDOT. As of the date of this letter, Mr. Larry Davis with the City of Coppell reports no relocation efforts have been completed by GTE. Mr. Davis has explained that apparently you are experiencing some difficulties with the Texas Department of Transportation relative to your relocation; however, we have received no written explanation, schedule or request for assistance GTE. The construction of this 12-inch water transmission main is critical to the proper operation of the City's water system and the health, safety and welfare of the public. It is vitally important that this water line be completed immediately so that the City can provide adequate service and fire protection to developments in this area of the City. On behalf of the City of Coppell, we request that GTE proceed with all forces, manpower and Mr. Jesse Vickers GTE Network Services August 26, 1999 Page Number 2 equipment necessary to complete the relocation of the communication line so that the construction of the water line can be completed. Please provide the City of Coppell a written response to this request within 5 business days outlining your plan and schedule for a timely relocation of your facility and direct your communication in this matter to Mr. Kenneth M. Griffin, P.E., Director of Engineering and Public Works, City of Coppell, (972) 304-3679. Gary C. cEcn.'clZenneth M. Griffin, P.E., City of Coppell Mr. Larry L. Davis, City of Coppell Mr. Gary Casteel, GTE