Loading...
Prestwick-CS011112 MEMORANDUM FROM THF~ DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: Larry Davis, Construction Inspector Engineering Avery Rodgers, Streets Division Public Works November 12, 2001 Walk-thru Prestwick 11/8/01 PAVING 1. Rout and seal joints in dead-end street that are broken. 2. Level up with asphalt where concrete meets asphalt on Deforest. DRAINAGE 2. 3. 4. Lid broken on inlet box. Lock broken on inlet box. Grout joint at box and RCP. Remove dirt and debris from RCP's (inlet box is holding water). CITY OF COPPELL PUBLIC WORKS DEPARTMENT From: Rhonda Brothers To: walk-thru group Date: Mon, Nov 5, 2001 11:35 AM Subject: Pmstwick Per Larry Davis, a final walk-thru for streets, utilities and drainage on the referenced project has been scheduled for Thursday, November 8, 2001 at 2:00 p.m. From: Rhonda Brothers To: walk-thru group Date: Mon, Nov 5, 2001 11:35 AM Subject: Prestwick Per Larry Davis, a final walk-thru for streets, utilities and drainage on the referenced project has been scheduled for Thursday, November 8, 2001 at 2:00 p.m.