Loading...
Prestwick-CS000818DEVELOPMENT FEES PROJECT NAME: Prestwick ENGINEER: Dowdey, Anderson & Assoc. OR G NAT ON DATE: 8/18/00 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 3/21/01 3/21/01 2% & 4% 3/21/01 3/21/01 3/21/01 3/21/01 3/21/01 3/21/01 Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection 2% early grading insp. Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS $6,750.00 $6,750.00 $7,919.54 $420.00 $12,825.00 $750.00 $750.00 $398.55 $525.00 $750.00 TotalFees $37,838.09 $6,750.00 $6,750.00 notify street dept. $7,919.54 $420.00 $12,825.00 Notify utility dept. when meters, taps or deposits are paid Fees Paid $34,664.54 5/10/01 5/10/01 5/10/01 8/18/00 5/10/01 Amount Owed $3,173.55 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Str. Improvement Escrow $7,693.57 NOTES Date Received 5/10/01 Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.