Primrose-CS 951012 ENG~NEER~N~ DEP~RTHENT MEMOR~NDU~ Q .~ DATE: OctoBer 12, 1995 _~ / - ) TO: Carolyn Bebermeyer, Accoun=j. I FROM: Howar_~ DmfFor~_ ~T~!]~ies~perintendent= RE: se~rkway Boulevard Water fees were paid on Au~st 8, 1995 for the above referenced project. At that time the general contractor paid for a 6" fireline metering device. The developer has since then re~ested a change in size of meter to 2", therefore it was necessary to issue a credit. It was further requested by the General Contractor that the amount to be refunded would be applied to the application for temporary construction meter made by Webb Homes. I have agreed to this and below I have indicated the total refundable cost to be transferred. $13,25.50 -173.65 $1,151.85 If you have any questions regarding this matter, please advise. HLP/dg