Princeton Park Addition, Lot 1, Block I (Phase I)
Development Fee ~ent
December 5, 1997
Dear Mr Wouters:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppeil in the amount of $4,500.00 and forward to the
Finance Depaxttaent along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Depa, tment will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, ..~ . .
Director of Enginffering & Public Works
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public S~rvices
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Princeton Park Addition, Lot 1, Block 1 (Phase 1)
Date: 12/5/97
TOTAL AMOUNT DU]~
F~.~-~ DUE PRIOR TO
COUNCIL
APPROVAL
l Water Impact Fee $3,375.00 $3,375.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $57.75
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigafion/Fireline) $4,975.95
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $105.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,125.00 $I, 125.00
(100% due prior to Council Approval)
wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee - $0.00 $0.00
.(100% due prior to Couacil Approval)
Street Light Fee laf~rmation not
(100 % due prior to Acceptance of Project available at this time
Street Sign Fee laformation not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $9,968.70
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $4,500.00
* See Roadway Impact Fee Calculation Sheet
U~VELOPMENT FEE WORKSHE=r
PROJECT: Princeton Park Addition, Lot 1, Block 1 (Phase I)
DATE: 12/5/97
Water [mpact Fee:
Domestic Meter(s): 1 - 1 inch 2.5
Irrigation Meter(s): I - I inch 2.5
Fireline Meter(s): 2 - 8 inch 2.5
Total 8: 7.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 8: 4 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total 8: I Domestic Meter(s) @ $57.75
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total 8: 1 Irrigation Meter(s) @ $57.75
Total 8: 0 Additional Irrigation Meter(s) @
Total 8: 2 Fireline Meter(s) @ $2,459.10
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total 8: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 8: 3 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
2.5
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total 8: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 8: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$3,375.00
$200.00
$57.75
$57.75
$0.00
$4,918.20
$30.00
$105.00
$1,125.00
$50.00
$50.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdentinl Developments Only):
~ Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
· $0.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at th~ time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
* See Roadway Impact Fee Calculation Sheet
Need submittal of
development contracts
Page 2