ITEM CAPTION:
Consider approval of an ordinance to amend the Land Use Assumptions and the Capital Improvement Plan for
Water, Wastewater and Roadway Facilities by amending the City of Coppell Code of Ordinances, Chapter 17,
Impact Fees; and authorizing the Mayor to sign.
GOAL(S):
IIII
.l.
APPROVED BY
CITY COUNCIL
ON ABOVE DATE
Motion to Approve
Ord. # 2005-1107
M - Tunnell
S - Brancheau
Vote - 6-0
York absent
EXECUTIVE SUMMARY:
Approval of this ordinance will revise the current Impact Fee Ordinance to bring it into compliance with current
state law.
Staff will be available to answer any questions at the Council meeting.
FINANCIAL COMMENTS:
Agenda Request Form - Revised 09/04 Document Name:# Impact Fee Ord
COPPELL
MEMORANDUM
TO: Mayor and City Council
FROM: Kenneth M. Griffin, P.E., Director of Engineering and Public Works
DATE: September 13, 2005
Consider approval of an ordinance to amend the Land Use Assumptions and the Capital
Improvement Plan for Water, Wastewater and Roadway Facilities by amending the City of
Coppell Code of Ordinances, Chapter 17, Impact Fees; and authorizing the Mayor to sign.
On August 23, 2005 a Public Heating was held to consider the amendment of the Land Use
Assumptions, Capital Improvement Plan for Water, Wastewater and Roadway Facilities and to
consider the imposition of Water, Wastewater and Roadway Impact Fees. A presentation was made
highlighting proposed changes to the Roadway Impact Fee and recommendations of the Capital
Improvement Advisory Committee concerning various capital improvements proposed in the plan and
the changing of the impact fee amount per equivalent service unit. There were no citizens present to
speak at the Public Heating. The revision to the Impact Fee Study has been a series of steps prescribed
by state law, which began on March 8, 2005 when City Council awarded the contract to Freese and
Nichols, Inc., to revise the Impact Fee Study. The item this evening is to approve the actual ordinance
that will revise the study and change several aspects of the current Impact Fee Study, such as:
Revise the roadway facilities zones from 10 to 1.
Revise the collection time of impact fees to state that Water and Wastewater Impact Fees are
collected at time of issuance of the building permit. The city will continue to collect Roadway
Impact Fees prior to the recordation of the final plat.
Included with the ordinance are the tables showing the maximum fees that could be assessed for water,
wastewater and roadways. The recommendation from the Capital Improvement Advisory Committee
was that the Roadway Impact Fee be set at $150 / per equivalent service unit, and that the Water and
Wastewater Impact Fee be set at $900 / per equivalent service unit. Both of these fees are less than the
maximum amount that could be assessed. As a reminder, the maximum amount that could be assessed
is 50% of what the actual study shows should be assessed to cover actual costs.
The final step in the revisions to the impact fees will take place in October 2005 when a new fee
ordinance is brought forth for consideration by City Council.
Staff recommends approval of the ordinance to amend the Land Use Assumptions and Capital
Improvement Plan for Water, Wastewater and Roadway Facilities. Staff will be available to answer
any questions at the Council meeting.
AN ORDINANCE OF THE CITY OF COPPELL, TEXAS
ORDIN CE No.
AN ORDINANCE OF THE CITY OF COPPELL, TEXAS,
APPROVING AMENDEMENTS TO THE LAND USE ASSUMPTIONS,
THE CAPITAL IMPROVEMENT PLAN FOR WATER,
WASTEWATER AND ROADWAY FACILITIES, CHANGES TO THE
IMPACT FEE CALCULATIONS BY AMENDING CHAPTER 17,
SECTIONS 17-1-04, 17-1-06 and 17-1-10 OF THE CODE OF
ORDINANCE; PROVIDING A REPEALING CLAUSE; PROVIDING
A SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City Council of the City of Coppell, Texas previously imposed Impact Fees
for Water, Wastewater and Roadway Facilities for the financing of Capital Improvements required for
new development in the City; and
WItEREAS, with the advise and assistance of the Capital Improvements Advisory Committee,
amendments to the Land Use Assumptions and the Capital Improvement Plan for Water, Wastewater
and Roadway Facilities have been prepared; and
WHEREAS, based on amendments to the Land Use Assumptions, amendments to the Capital
Improvement Plan for Water, Wastewater and Roadway Facilities have been prepared by Freese and
Nichols, Inc., in a document entitled "Impact Fee Capital Improvement Plan - Water, Wastewater and
Roadway", dated August 2005; and
WHEREAS, the Capital Improvement Advisory Committee has filed written comments on
the amendments to the Land Use Assumptions and the Capital Improvement Plan for Water,
Wastewater and Roadway Facilities and the City Council has received and reviewed those comments;
and
WHEREAS, the City Council of the City of Coppell has given notice and held a public heating
required by Chapter 395 of the Texas Local Government Code for the amendments to the Land Use
Assumptions, the Capital Improvement Plan for Water, Wastewater and Roadway Facilities Plan and
modification of impact fees for the financing of capital improvements required by new development
within the city; and
WHEREAS, the City Council finds it is the best interest of the City of Coppell and its citizens
to approve and adopt the amendments to the Land Use Assumptions and the Capital Improvement Plan
for Water, Wastewater and Roadway Facilities and to establish impact fees consistent with the Capital
Improvement Plan and to make other conforming changes to the Code of Ordinances.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF COPPELL, TEXAS:
SECTION 1. Thc City of Coppell, Texas hereby approves and adopts thc "Impact Fee Capital
Improvement Plan - Water, Wastcwatcr and Roadway", dated August 2005 and prepared by Frecsc
and Nichols, Inc., as thc amended Land Use Assumptions and Capital Improvement Plans for Water,
Wastewater and Roadway Facilities of the city.
SECTION 2. That the City of Coppell Impact Fee codified in Chapter 17, Sections 17-1-04,
17-1-06, and 17-1-10, of the Code of Ordinances be, and thc same is, hereby amended to provide for
the changes to the impact fee calculations, which shall read as follows:
"CHAPTER 17. IMPACT FEE
ARTICLE I - IMPACT FEES, GENERAL PROVISIONS
Sec. 17-1-04. Definitions
15. Service Area means in the case of impact fees for roadway facilities, the roadway facility
benefit area described on the service area map .....
See. 17-1-06. Impact Fee as Condition of I)evelopment Approval
No application for new development shall be approved within the city without assessment of
an impact fee pursuant to this chapter and no final plat shall be approved unless applicant has
paid the roadway impact fee imposed by and calculated hereunder. Water and Wastewater
Impact fees shall be assessed at time of final plat and paid at time of issuance of building
permit.
Sec. 17-1~10. Computation and Collection of Impact Fees
A. The roadway impact fees due for new development shall be collected prior to
recordation of the subdivision plat. Water and wastewater impact fees shall be
collected at issuance of building permit. If the exact final usage of the land is unknown
2
at the time of platting so as to make it impossible to calculate the equivalent service
units, or if new development occurs or is proposed to occur without platting, then the
roadway impact fee shall be due at the time of connection to city water or wastewater
system or at the time of building permit, unless an agreement between the city and the
developer has been executed providing for a different time of payment.
SECTION 3. That Chapter 17 of the Code of Ordinances of the City of Coppell,
Texas, is amended by adopting the following Schedules which are attached to this Ordinance,
as part of Chapter 17 and which shall be added to the Code of Ordinances of the City of
Coppell, Texas. Maximum Fee Rate for Impact Fees, Schedule 1; Payment and Collection Fee
Rate, Schedule 2; Water and Wastewater Benefit Area Map, Schedule 3; Roadway Benefit
Area, Schedule 4.
SECTION 4. That should any sentence, paragraph, subdivision, clause, phrase or
section of this ordinance or the Code of Ordinances, as amended hereby, be adjudged or held
to be unconstitutional, illegal or invalid the same shall not affect the remaining provisions of
said ordinance or the Code of Ordinances, as amended hereby, which shall continue in full
force and affect.
SECTION 5. That all the provisions of this ordinance are hereby declared to be
governmental and for the health, safety and welfare of the general pubic. Any member of the
City Council or any City official or employee charged with the enfomement of this ordinance
or the Code of Ordinances as amended hereby, acting for the City of Coppell, Texas, in the
discharge of their duties, shall not thereby render themselves personally liable; and they are
hereby relieved from all personal liability for any damage that might occur to persons or
property as a result of any act required or permitted in the discharge of said duties.
SECTION 6. That any violation of this ordinance may be enjoined by a suit filed in
the name of the City of Coppell, Texas, in a court of competence jurisdiction; and this remedy
shall be in addition to any penal provision in this ordinance or in the Code of Ordinances of the
City of Coppell, Texas as amended hereby.
SECTION 7. That this ordinance shall take effect immediately from and a~er its
passage and the publication of the caption as the law and charter in such cases provide.
DULY PASSED by the City Council of the City of Coppell, Texas, this the/.~ ~g~lay
o~005.
DOUdLA"~ N. ~OVERkMXYOR
ATTEST:
j~l'x~ SECRETARY
APPR~
ROBERT E. HA/~, CITY ATTORNEY
(REI-Fcdb [Rev.&~Revised 09/06/05] 77245)
MAXIMUM FEE RATE FOR IMPACT FEES
SCHEDULE 1
WATER FACILITY MAXIMUM FEE PER SERVICE UNIT
Meter Size E.S.U. * Water Impact Fee
5/8" x 3/4" 1.00 $ 990.00
1" 1.67 $ 1,653.30
I 1/2" 3.33 $ 3,296.70
2" 5.33 $ 5,276.70
3" 11.67 $ 11,553.30
4" 21.00 $ 20,790.00
6" 46.67 $ 46,203.30
8" 80.00 $ 79,200.00
WASTEWATER FACILITY MAXIMUM FEE PER SERVICE UNIT
Meter Size E.S.U. * Water Impact Fee
5/8" x 3/4" 1.00 $ 933.00
I" 1.67 $ 1,558.11
1 1/2" 3.33 $ 3,106.89
2" 5.33 $ 4,972.89
3" 11.67 $ 10,888.11
4" 21.00 $ 19,593.00
6" 46.67 $ 43,543.11
8 80.00 $ 74,640.00
ROADWAY FACILITY MAXIMUM FEE PER SERVICE UNIT
Service Area Cost Per Service Unit
1 $ 168.00
* From AWWA Manual 6, Water Meters - Selection,
Installation, Testing and Maintenance, 3'a edition, 1986
PAYMENT AND COLLECTION FEE RATE
SCHEDULE 2
WATER FACILITY
PAYMENT AND COLLECTION FEE PER SERVICE UNIT
Meter Size E.S.U. * Water Impact Fee
5/8" x 3/4" 1.00
1" 1.67
1 1/2" 3.33 Fee Set by Separate
Resolution
2" 5.33
3" 11.67
4" 21.00
6" 46.67
8" 80.00
WASTEWATER FACILITY
PAYMENT AND COLLECTION FEE PER SERVICE UNIT
Meter Size E.S.U. * Water Impact Fee
5/8" x 3/4" 1.00
1" 1.67
1 1/2" 3.33 Fee Set by Separate
2" 5.33 Resolution
3" 11.67
4" 21.00
6" 46.67
8" 80.00
ROADWAY FACILITY
PAYMENT AND COLLECTION FEE PER SERVICE UNIT
Service Area Cost Per Service Unit
1 Fee Set by Separate
Resolution
* From AWWA Manual 6, Water Meters - Selection,
Installation, Testing and Maintenance, 3rd edition, 1986
I WATER AND WASTEWATER BENEFIT AREA
II -~ P.H E DU LE :3
I CitY OF CnPPELI
~ COPPELL
1 INCH = 5000 FT. ~--~ .,: .~ ~..,,~ ~., s.. ~.. ~
F~nADWAY BENEFIT AREA
· c~ nHEDLILE 4
P. iTY nF I-:.nPPELL
0 2500 5000 - ~ · ~ ;; °'
~ COPPELL
I INCH = .5000 FT. ~.~s*r~,.~'. ";