Loading...
Pecan Ridge-AG 901211CITY COUNCIL MEETING REQUEST FORM I'I~M NUMBER ~) Considerati~m and approval of a prelimln~y plat of the north side of Sandy Lake Road, west at the request SUBMI'I-FED Estates located alon~ = Hollow Addition, EVALUATION OF ITEM: Date of P]~nninE & Zoni.~o Commissio~ MeetinE: Decision of pl~nnin~o & Zoninoo Commissioa: Aplaoved (?-0) with the conditim~ that they procure dedication and construct to Public Works satisfaction an improved Lodge Road, alon~ with all other required conditions. STAFF REP.: Gary L. Sieb, plim.,,,i.~o Director OTHER REP.: DATE: November 8, 1990 Request: Approval of a prelimln~'y plat. If approved, the plat will allow the construction of single- Please .e attached s.ff report for further ~/. ~'.''''''' '. ~ AMT +/- BUDGET LEGAL REVIEW BY: FINANCIAL REVIEW BY CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT PECAN RIDGE ESTATES ADDITION - PRELIMINARY PLAT P & Z HEARING DATE: November 8, 1990 C. C. HEARING DATE: December 11, 1990 LOCATION: The north side of Sandy Lake Road, west side of Lodge Road and south of Pecan Hollow Addition. SIZE OF AREA: 21.2 Acres REQUEST: Approval of a preliminary plat of the Pecan Ridge Addition. APPLICANT: Mr. Ron Fraze International Gateway 10751 Mapleridge Drive Dallas, Texas 75238 (214) 349-4095 Engineer, Bill Anderson Dan Dowdey & Associates 16250 Dallas Parkway Suite #100 Dallas, Texas 75248 (214) 931-0694 HISTORY: A planned development (PD) request for this tract along with the Pecan Valley parcel located on the east side Lodge Road, was approved on September 18, 1990. of TRANSPORTATION: The thoroughfare plan indicates that Lodge Road will be a 2-lane undivided roadway, and Sandy Lake will serve as a 6-lane divided thoroughfare. Lodge Road, in its present state of condition is considered as a substandard roadway due to its ashpalt overlay and absence of curb and qutters. It is the intention of the developer to improve Lodge Road from the Pecan hollow site (north of this plat) south, all the way to the intersection of Sandy Lake Road. Additional right-of-way which has not yet been obtained from the other property owners, will be necessary in order to achieve the future street expansion. The developer is working with the adjoing property owners to secure the necessary right-of-way and will address the results at the Planning and Zoning and City Council meeting. ANALYSIS: The plat request complies with the (PD) approved on ITI~M 9 ALTERNATIVES: ATTAC~NTS: September 18th, and meets the subdivision regulations as outline in the Comprehensive Subdivision Ordinance. Staff recommends approval of the preliminary plat. 1) Approve the preliminary plat. 2) Deny the preliminary plat. 1) Preliminary Plat. PRDGSTF