Pecan Ridge-CS 911205Mr. Howard Pafford
6oppe11~ tX 75019
12/5/91 n Rid
Howard
Maint, ~ ~ ~zc~t__ .
]Copy of ~l~Cel [ ] CoW of ~ccer [ ] $~¢lfl~Clw
] C~a~Ie order [ ~ Maintenance Bond for utility Improvements
DAT~ ~. ~CR~FTION
12/5/91 Maintenance Bond for Pecan Ridge Estates
for utility Improvements
OMi
G ~x iIMiw and clmunI~
ID Note & Forward To:
O~m~
0 Retm. u Markup Plans vith Cerr~'tiom
0 Note & Reply To:
Please find the maintenance bond attached for
your use.
SAFECO INSURANCE COMPANIES
SAFECO INSURANCE COMPANY OF AMERICA
GENERAL INSURANCE COMPANY OF AMERICA
FIRST NATIONAL INSURANCE COMPANY OF AMERICA
MAINTENANCE BOND
KNOW ALL .,lIEN BY THESE PRESENTS, That we,
Bond No. 5696531
Cullu~ Construction COal)uny, Inc.
as Principal, and SAFECO INSURANCE COMPANY OF AMERICA, a corporation organized under the laws of the State
Texas
of Washington and duly authorized to do business in the State of
as Surety, are held and firmly bound unto City of Coppell, Texas
as Obligee, in the penal sum of. T~enty Nine Thousund Eight Hundred Eleven und 01/100 - - -
............................ ($ 29,811.01 ),
to which payment well and truly to be made we do bind ourselves, our and each of our heirs, executors, administrators,
successors and assigns jointly and severally, firmly by these presents,
WHEREAS, the said Principal entered into a Contract with the
Ever fine/Gate~ay Partnership
for
June 19, 1991
dated
Utility Improvements for Pecun Ridge Estates, City of Coppell, Texas
WHEREAS, said Contract provides that the Principal will furnish a bond conditioned to guarantee for the period of
0~4 ~ year(s) after approval of the final estimate on said job, by the owner, against all defects in workmanship and
materials which may become apparent during said perio& and
WHEREAS, said Contract has been completed and was approved on
day of. November 19 91 .
8th
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That, if the Principal shall indemnify the
Obligee for all loss that the Obligee may sustain by reason of any defective materials or workmanship which become
apparent during the period of 1 year(s) from and after November 8, 1991
then this obligation shall be void, otherwise to remain in full force and effect.
Signed, sealed and dated this
8th day of Nov°tuber ,19 91
~v~. U~ Ct~STRUC"rION COMPAI~,INC. (Seal)
(Seal)
Linda Spratt ff Attorney-in-Fact
POWER
OF ATTORNEY
SAFECO
SAFECO iNSURANCE COMPANY OF AMERICA
GENERAL ~NSURANCE COMPANY OF AMERICA
HOME OFFICE SAFECOPLAZA
SEATTLE. WASHINGTON 98185
No. __~%318
KNOW ALL BY THESE PRESENTS:
That SAFECO INSURANCE COMPANY OF AMERICA ~,~d GENERAL INSURANCE COMPANY OF AMERICA,each
a Washington corporation, does each hereby appoint
............. DAVID O. TURNER; HARRY J. BRO~NLEE; STEVEN W. POND; STEVEN A. GUCKENHEIMER;
MICHAEL DWIGHT WILLIAMS; LINDA SPRATT; JEFFERY L. TRENTHA~{; Dallas, Texas ...............
its true and lawful attorney(s)-in-fact, with full authority to execute on ~ts behalf fidehty and surety bonds or undertakings
and other documents of a similar character issu?d in the course of its business, and to bind the respective company thereby
IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY
OF AMERICA have each executed and attested these presents
this 13th __ day of April ,19 90
CERTIFICATE
Extract from the By-Laws of SAFECO INSURANCE COMPANY OF AMERICA
and of GENERAL INSURANCE COMPANY OF AMERICA:
"Article V, Section 13. -- FIDELITY AND SURETY BONDS . . the President. any Vice President, the Secretary, and any
Assistant Vice President appointed for that purpose by the officer in charge of surety operations, shall each have authority
to appoint individuals as attorneys-in-fact or under other appropriate titles with authority to execute on behalf of the
company fidelity and surety bonds and other documents of similar character issued by the company m the course of its
business... On any instrument making or evidencing such appointment, the s~gnatures may be affixed by facsimile On any
instrument conferring such authority or on any bond or undertaking of the company, the seal, or a facsimde thereof, may be
impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the
vatidity of any such instrument or undertaking"
Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA
and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970
"On any certificate executed by the Secretary or an assmtant secretary of the Company setting out, (i) The provisions of Article V, Section 13 of the By-Laws. and
(ii) A copy of the power-of-attorney appointment, executed pursuant thereto, and
(iii) Certifying that said power-of-attorney appointment ~s in full force and effect,
the signature of the certifying officer may be by facsimile, and the seal of the Company may be a facsimile thereof"
I, Boh A. Dickey, Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE
COMPANY OF AMERICA, do hereby certify that the foregoing extracts of the By-Laws and of a Resolution of the Board of
Directors of these corporations, and of a Power of Attorney issued pursuant thereto, are true and correct, and that both the
By-Laws, the Resolution and the Power of Attorney are still in full force and effect
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of said corporation
8th l/ove~ber
this day of
91
19__
;(214) 271-9333
CULLUM CONSTRUCTION COMPANY, INC.
MUNICIPAL CONTRACTORS
Post Office Box 8455
Dallas, Texas 75205
EVERFINE/GATEWAY OCTOBER 25, 1991
1075i MAPLERIDGE DRIVE ESTIMATE # 4 & FINAL JOB # 1140
DALLAS, TEXAS 75238 WATER, SANITARY SEWER & STORM SEWER
PECAN RIDGE EST AND LODGE ROAD
COPPELL TEXAS
CONTRACT QUANTITY ITEM UNIT AMOUNT
OUANTITY INSTALLED PRICE INSTALLED
WATER
3,400.00 3,400.00 -LF- 8" PVC DR 14 9.30 31,620.00
60.00 60.00 -lf- 6" PVC DR 14 9.45 567.00
11.00 11.00 -EA- 8" GATE VALVES 375.00 4,125.00
6.00 6.00 -EA- 6" GATE VALVES 265.00 1,590.00
6.00 6.00 -EA- FIRE HYDRANTS 1,055.00 6,330.~0
1.00 1.00 -EA- RELOCATE FIRE HYDRANT 540.00 540.00
1.00 1.00 -EA- 2" BLOWOFF VALVE 420.00 420.00
1.00 1.00 -EA- 16" X 8" TAPPING SLEEVE 1,785.00 1,785.00
2.50 2.50 -TONS- FITTINGS 1,080.00 2,700.00
58.00 58.00 -EA- 1" WATER SERVICES 339.00 19,662.00
1.00 1.00 -EA- 3/4" SERVICE W/ METER " 463.00 463.00
2.00 2.00 -EA- 1 1/2" SERVICE W/ METER 1,135.00 2,270.00
1.00 1.00 -LS- WATER TEST 490.00 490.00
TOTAL WATER
72,562.00
SANITARY SEWER
3,554.00 3,554.00 -LF- 8" PVC 10.75 38,205.50
36.00 36.00 -LF- 8" OI PIPE 18.75 675.00
10.00 10.00 -EA- 4' MANHOLES 1,285.00 12,850.0~
1.00 1.00 -EA- 4' DROP MANHOLE 1,530.00 1,530.00
2.00 2.00 -EA- CLEANOUT 255.00 510.00
80.00 80.00 -LF- CONCRETE ENCASENENT 12.00 960.00
58.00 58.00 -EA- 4" SEWER LATERALS 225.00 13,050.00
1.00 1.00 -EA- CONNECT TO EXISTING MANHOLE 400.00 400.00
1.00 1.00 -tS- TEST & TV SEWER 4,260.00 4,260.00
1.00 1.00 -LS- TRENCH SAFETY 415.00 415.00
1.00 1.00 -LS- ABANDON 8" SEWER & MH'S 1,280.00 1,280.00
1.00 1.00 -tS- LOWER EXIST MANHOLES 1,300.00 1,300.00
TOTAL SANITARY SEWER 75,435.50
(214) 271-9333
CULLUM CONSTRUCTION COMPANY, INC.
MUNICIPAL CONTRACTORS
Post Office Box 8455
Dallas, Texas 75205
EVERFINE/GATEWAY OCTOBER 25, 1991
10751 MAPLERIOGE DRIVE ESTIMATE # 4 & FINAL OOB # 1140
DALLAS, TEXAS 75238 WATER, SANITARY SEWER & STORM SEWER
PECAN RIDGE EST AND LODGE ROAD
COPPELL TEXAS
CONTRACT OUANTITY ITEM UNIT AMOUNT
OUANTITY INSTALLED PRICE INSTALLED
170.00 170.00
159 00 159 00
180 00 180 00
298 00 298 00
402 00 402 00
182 00 182 00
195 00 195 00
176.00 176.00
472.00 472.00
4.00 4.00
5.00 5.00
4.00 4.00
2.00 2.00
1.00 1.00
1.00 1.00
1.00 1.00
14.00 14.00
1.00 1.00
1.00 1.00
630.00 630.00
512.00 512.00
STORM
-LF- 5 X 3 BOX CULVERT
-LF- 48" RCP
-LF- 45" RCP
-LF- 42" RCP
-LF- 36" RCP
-LF- 27" RCP
-LF- 24" RCP
-LF- 21" RCP
-LF- 18" RCP
-EA-10' CURB INLET
-EA- 8' CURB INLET
-EA- 6' CURB INLET
-EA- 4' CURB INLET
-EA- 3 GRATE INLET
-EA- 2 GRATE INLET
-EA- 6 X 6 JUNCTION BOX
-EA- PIPE TO PIPE CONNECTIONS
-EA- REMOVE EXISTING HEADWALL
-LB- TRENCH SAFETY
-LF- INSTALL 3" TU CONDUIT
-LF- 4" IRRIGATION CONDUIT
95.20 16,184.00
64.60 10,271.40
60.60 10,908.00
53 70 16,002.60
41 00 16,482.00
28 00 5,096.00
25 00 4,875.00
22 30 3,924.80
20 00 9,440.00
1 710.00 6,$40.00
1 610.00 8,050.00
1 400.00 5,600.00
2 540.00 2,540.00
3 390.00 3,390.00
180.00 2,520.00
390.00 390.00
3.10 1,953.00
3.40 1,740.80
TOTAL STORM
LODGE ROAD
130,707.60
1,150.00 1,150.00 -LF- 8" PVC DR 14 10.30 11,845.00
2.00 2.00 -EA- 8" GATE VALVES 375.00 750.00
1.00 1.00 -EA- 16" X 8" TAPPING SLEEVE 1,785.00 1,785.00
1.00 1.00 -LB- WATER TEST 315.00 315.00
TOTAL LODGE ROAD
14,695.00
1.00 1.00 -LS- PERFORMANCE & PAYMENT BONDS 4,710,00 4,710.00
TOTAL PECAN RIDGE ESTATES 298,110.10
AND LODGE ROAD
TOTAL JOB TO DATE
LESS 0% RETAINAGE
TOTAL AMOUNT DUE
LESS AMOUNT PREVIOUSLY PAID
298,110.10
0.00
298,110.10
258,885.09
AMOUNT DUE THIS ESTIMATE
39,225~01
DAN DOWDY & ASSOCIATES
16250 DALLAS PARKWAY SUITE
DALLAS, TEXAS 75248
ATTN: BILL ANDERSON
100