Loading...
Pecan Ridge-CS 910614 (2)Development Plans and Fee Assessment P.O. Box 478 Coppell, Texas 75019 214-462-0022 JUN '1991 PUBLIC Dear Mr. Anderson: Attached please find nine (9) approved sets of final construction plans for the above referenced project. You will also find a list of the development fee assessment related to this project, dated June 14, 1991. Please provide a check in the amount of $177,572.13 made payable to the City of Coppell and forward it to the attention of Ms. Carolyn Bebermeyer, Finance Department, no later than July 12, 1991. If you have any questions, please contact Ben dela Cruz or myself at (214) 393-1016. We appreciate your timely attention, and look forward to working with you on this project. Sincerely, Acting City Engineer MSD/bd CC: Gary L. Sieb, Director of Planning and Community Services Steve Goram, Director of Public Works Larry Davis, Construction Inspector Taryon Bowman, P & Z Coordinator Carolyn Bebermeyer, Finance Department Ron Freze, Everfine/Gateway Partnership PECANR Date: Project: CITY OF COPPELL DEVELOPMENT FEES June 14, 1991 Pecan Ridge Estates TOTAL FEES PAYABLE BY 7-12-91 Park Fee Assessment $ 8,700.00 (58 lots X $150 Per Lot) (50% due at final plat approval) (50% due prior to bldg. permits issuance) Water Impact Fee $ 38,280.00 (100% due prior to Council approval of final plat) Water Tap Inspection Fee $ 5,800.00 (100% due prior to issuance of building permit) Wastewater Impact Fee *$ 24,476.00 (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee $ 5,800.00 (100% due prior to issuance of building permit) Street Sign Assessment $ 1,960.56 (see attached) Street Light Assessment ** ($292.60 X ...... poles) (see attached) Roadway Assessment/Sandy Lake Road $120,372.26 (706.41' X$170.40 F.F.) Street Cut Permit $ 100.00 Construction Inspection Fee $ 12,509.31 (2% of Construction cost) in the amount of $625,465.50 provided by Dowdey & Assoc. Engineers $ 4,350.00 $ 38,280.00 1,960.56 $120,372.26 $ 100.00 $ 12,509.31 TOTAL AMOUNT DUE: $217,998.13 $177,572.13 TOTAL DUE BY JULY 12, 1991 $177,572.13 NOTE: * IF PROPERTY TO BE DEVELOPED IS IN TRE COPPELL MUNICIPAL UTILITY DISTRICT #1, WASTEWATER IMPACT FEE SHALL BE ASSESSED, BUT SHALL NOT BE COLLECTED UNTIL SUCR TIME AS AN INTERLOCAL AGREEMENT IS MADE BETWEEN THE CITY AND MUD. THIS FEE CANNOT BE ASSESSED UNTIL AFTER TH ELECTRIC SUBMITS THE LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN SUBMITTED $292.60 PER LIGHT WILL BE ASSESSED. IS PECANR1 ,. hohre and, ctin city ngineor H~ar~Pafford, Water Utilities Superintendent~ ~velo~ent Fees for Pecan Ridge The following fees should be assessed on the above referenced project. Water Impact Fee: 58 -~ Domestic Heter/s = 58 ESU's Irrigation Meter/s = ESU's Fireline Heter/s = ESU's Total 58 ESU's ~ $660.00 ea = 38~0.0q 100% due prior to Council approval of final plat. Wastewater ~act Fee: 5--8- 5/8" x 3/4" Domestic Meter/s = 5-SESU's ~ $422.00 = $24.476.00 100% due prior to Council approval of final plat. * Note= If property to be developed is in the Coppell Hunicipal Utility District %1 this fee shall be assessed, but shall not be collected until such time as an interlooal agreement is made between the City and MUD. Water Ta~ Inilme~tion Z~ee 58 Connections ~ $100.00 each = $5.800.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee H/A 58 Connections ~ $100.00 each = $5.800.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots at $150.00 each = $8.700.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer~ prior to Council approval of final plat. 50% r~m~ining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. cc: Steven G. Goram, Director of Public Works STREET SIGN ASSESSMENT for Pecan Rid e The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT ~RICE ~ EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 16 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 Stop & Street Combo $ 96.85 7 OTHER Yield/Street $ 90.29 I $ 90.29 Keep Riqht $ 58.56 2 $ 117.12 Dead End $ 58.56 I $ 58.56 TOTAL $1,960.56 $1,016.64 $ 677.95 * Cost breakdowns may be obtained from Public Works by written request. PECAN. HLP Revised 4/I/91