Pecan Ridge-CS 910517The following fees should be assessed on the above referenced
project.
Water Impact Fee:
58 - 5/8" x 3/4"
Domestic Meter/s = 58 ESU's
Irrigation Meter/s = ESU's
Fireline Meter/s = ESU's
Total 58 ESU's ~ $660.00 ea = $38,280.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee:
5--8 - 5/8" x 3/4" Domestic Meter/s = 5__8 ESU's ~ $422.00 = $24,476.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD,
Water Tap Inspection Fee
58 Connections ~ $100.00 each = $5,800.00
100% due prior to issuance of building permit.
Sewer Tap Inspectio~ Fee N/A
58 Connections @ $100.00 each = $5,800.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
see attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
58
Residential Lots at $150.00 each = $8,700.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer~
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc= Steven G. Goram, Director of Public Works
STREET SIGN ASSESSMENT
for Pecan Ridge
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 16 $1,016.64
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60
Stop & Street Combo $ 96.85 7 $ 677~95
OTHER
Yield/Street $ 90.29 I $ 90.29
Keep Riqht $ 58.56 2 $ 117.12
Dead End $ 58.56 1 $ 58.56
TOTAL S1,960.56
* Cost breakdowns may be obtained from Public Works by written
request.
PECAN.HLP Revised 4/1/91