Loading...
Pecan Ridge-CS 910402DR TF.: RE: COPPEIoL PIItiLIC WORKS I~EHOI~tNDUH April 2, 1991 Shohre Daneshmand, Acting City Engineer Howard Pafford, Water Utilities Superintende Development Fees for Pecan Ridge Estates The following fees should be assessed on the above referenced project. Water l~}act Fee: ~ 58 - $/8"x3/4" __~_ - N/A Total 58 Domestic Meter/s = 58 ESU's Irrigation Meter/s = N/A ESU's Fireline Meter/s = N/A ESU's __ ESU's @ $660.00 ea = $38,280.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: 58 - 5/8"x3/4" Domestic Meter/s = 58 ESU's @ $422.00 = $24,476.00 100% due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District #1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap inspection Fee ~.5~__ Connections @ $100.00 each = $5,800.00 100% due prior to issuance of building permit. .qo,~eor ~',~p ln.~pect~on Fee tTtmnoct:ton,,~ ~ $100.00 each = ~q_5,800.00 100% tine prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 58 Residential Lots at $150.00 each = $8,700.00 .__~A Units (Multi family) at $75.00 each = N/A 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you ;]ave any questions regarding these assessments please advise. cc: Steven G. Goram, Director of Public Works PECANRID.HLP STREET SIGN ASSESSMENT for PECAN RIDGE ESTATES The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 - Speed Limit S63.54 16 1016.64 Yield $58.56 1 58.56 Stop $65.12 Street Name $11.60 1 11.60 Stop & Street Combo $96.85 7 677.95 OTHER Keep Riqht $63.54 2 127.08 TOTAL $1,891.83 * Cost breakdowns may be obtained from Public Works by written request. STSIGN.HLP