Pecan Ridge-CS 910402DR TF.:
RE:
COPPEIoL PIItiLIC WORKS
I~EHOI~tNDUH
April 2, 1991
Shohre Daneshmand, Acting City Engineer
Howard Pafford, Water Utilities Superintende
Development Fees for Pecan Ridge Estates
The following fees should be assessed on the above referenced
project.
Water l~}act Fee:
~ 58 - $/8"x3/4"
__~_ - N/A
Total 58
Domestic Meter/s = 58 ESU's
Irrigation Meter/s = N/A ESU's
Fireline Meter/s = N/A ESU's
__ ESU's @ $660.00 ea = $38,280.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee:
58 - 5/8"x3/4" Domestic Meter/s = 58 ESU's @ $422.00 = $24,476.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap inspection Fee
~.5~__ Connections @ $100.00 each = $5,800.00
100% due prior to issuance of building permit.
.qo,~eor ~',~p ln.~pect~on Fee
tTtmnoct:ton,,~ ~ $100.00 each = ~q_5,800.00
100% tine prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
58 Residential Lots at $150.00 each = $8,700.00
.__~A Units (Multi family) at $75.00 each = N/A
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you ;]ave any questions regarding these assessments please
advise.
cc: Steven G. Goram, Director of Public Works
PECANRID.HLP
STREET SIGN ASSESSMENT
for PECAN RIDGE ESTATES
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $53.10 -
Speed Limit S63.54 16 1016.64
Yield $58.56 1 58.56
Stop $65.12
Street Name $11.60 1 11.60
Stop & Street Combo $96.85 7 677.95
OTHER
Keep Riqht $63.54 2 127.08
TOTAL $1,891.83
* Cost breakdowns may be obtained from Public Works by written
request.
STSIGN.HLP