Loading...
Pecan Ridge-CS 910311The City With A Beautiful Future March 11, 1991 Mr. Ron Fraze Everfine/Gateway, U.S.A. 10751Mapleridge Drive Dallas, TX 75238 Re: Water and sanitary sewer availability to serve proposed ~pecaa~!~Ridge Estates.(58 lots) and Pecan Valley (52 lots), City of Coppell, Texas. Dear Mr. Fraze: As requested, I have reviewed the City of Coppell Sanitary Sewer and Water Distribution Plan to ascertain that service is available to serve the approximately 110 lot plans referenced above. There are water facilities in Sandy Lake Road (16" main) and Lodge Road (8" main). There is an existing 10" sanitary sewer main in Lodge Road, which should accommodate these two projects which are within this service basin. However, to tie into this 10" sanitary sewer line, would require annexation into the Coppell Municipal Utility District #1. If ~ou have erely,~[~ Water Utilitie~ HLP/mp Ustions, uperintendent please contact me at 462-8495. cc: Steven G. Goram, Director of Public Works COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: February 11, 1991 Shohre Daneshmand, Acting City Engineer Howard Pafford, Water Utilities Superintendex Water/Wastewater Fee Assessments for~Pecan The following fees have been calculated for developer. Water Impact Fee 58 5/8" x 3/4" meters = E.S.U.'s @660.00 each 100% due prior to Council approval of final plat. Wastewater Impact Fee 58 5/8" x $/4" meters = E.S.U.'s 6 422.00 each 100% due prior to Council approval of final plat. Water Tap Inspection Fee 58 Connections 6100.00 each 100% due prior to issuance of Building Permit. submittal to $38,280.00 $24,476.00 $ 5,800.00 Sewer Tap Inspection Fee 58 Connections 6100.00 each 100% due prior to issuance of Building Permit. HLP/mp $ 5,800.00 PECANRID.HLP