Loading...
Pecan Valley-LR 911104GEO - INc. CONSULTING SPECI&LIST~ IN; Environmental Assessments F~vlronmenml En~in~rtn~ Soils & Foun~i~ ~sinc~ Con~cgon Ma~a]s Teeing ~c~l & I~s~al Ins~ctlon "Excellence by Experience" PROJECT: CLIENT: TIME: TEST NO. 1 3 4 6 FIELD COMPACTION REPORT Pecan Valley Estates LOCATION: Coppe11, Texas Everfine / Gateway JOB ~: 90-366 DATE: 10-25-91 9:30 /~ L~)CATI~ AND LI~' Block "A", Lot 10; Lift Block #A', Lot 11; 1st Lift Beaver Run on 6' Left of CL Station 7+00; 6th Lift Beaver Run on 6' Left of"~L ~ Station 7+00; 8th Lift Beaver Run on 4' Le~% of CL Station 7+75t 6th Lift Beaver Run on 4' Left of CL @ Station 7+75; 8th Lift PROCTOR NUMBER (3) WATER CeNT o 16.7 DRY DEN. (PCZ} 100.7 PER- CENT COMP. 94.0 (3) 17.2 100.6 93.9 (2) 14.7 113.7 97.4 (7) 15.1 106.1 99.9 (7) 16.3 102.8 96.7 (7) 14.8 104.~ 98.1 Ail Tests Passed. Minimum Compaotion Required: PROCTORS: 95.0% (2) Reddish Brown & Gray Sandy Clay (3) Brown & Tan Silty Clay (7) Dark Brown Silty Sandy Clay 116.7 PCF ~ 107.1 PCF @ 106.2 PCF @ 13.7% MOISTURE 17.0% MOIS~rORE 16.4% MOISTURE Shane Robinson INSPECTOR 1939 F~ast Continental Boulevard · Southlake, Texas 76092 (817) 329-0281 · (800) 348-6308 · Fax (817) 488-1866 GEO - NC. Po05 CONSULTING SPECIAi. IST~ IN.+ l~nvironm~ntal Assessments Soils & Foundafl~ Co~tmction M~$ Te~gng Co~e~i~l & I~d~*sttial Ifls~tion "Excellence by Experience" PROJECT: DATEr 10-25-91 DAY: WEATHERi Sunny & Windy TIME IN: 8:00 AM WORKING CONDITIONSt Good Pecan Valley Addition Friday CONTRACTOR: JOB $: 90-366 TEMP: LOW: 60F HIGH: 80F I%AINFALL (IN): None TIME OUT: 3:30 PM SunWest Excavating, Inc. Travelled to the Job site for the purpose of visually inspecting the removal of foreign debris from freshly placed fill, and testing compaction Of fill with nuclear gauge. Also, monitoring the removal of stockpiled waste material, keeping log and filling out transport certificates. Two (2) Moisture/Density tests taken on first llft at Block "A", Lot 10 and 11. Both lots passed. Four (4) tests taken in street on Beaver Run Drive, sixth and eighth lift. All passed. Met with Krs. Linda Veronich with The City of Coppell. She reqllested the remaining stockpiled material be covered to prevent leaking into uncontaminated material. The request was passed on to Mr. Ron Fraze of Everfine / Gateway Partnership, Mr. Bill Anderson of Dan Dowdey & Associates and Mr. Ken Blanton of SunWest Excavatingb~Mr. David W. Martin of Geo- Technique, Inc. Departed job site. Inspector 1939 East Continental Boulevard Southlake, Texas 76092 (817)329-0281 · (800)348-6308 · Fax(817)488-1866 GEO - TECHNIQUE INC. CONSULTING SPKCIALIST$ IN; Environmental A$~¢m~ments Envit'onmental Engin~rin8 Soils & Foundation Eoglncoring Constraetion Materials Testing Commercial & Industrial Inapection "£xcellencebyExperience" PROJECT: Pecan V&lley Addition DATEI 10-24-91 DAY: WEATHER: Sunny & Windy TIME IN: 8:30 AM 2=30 PM WORKING CONDITIONS: Thursday Good CONTRACTOR: JOB ~: 90-366 TE~P: LOW: 60F HIGH: 80F RAINFALL (IN): None TIME OUT: 10:30 AM 4:30 PM SunWest Excavating, Inc. 8:30 AM Travelled to the job site for the purpose of visually inspecting the removal of foreign debris on Pecan Hollow Drive, Station 1+00 thru 3+00. No debris taken. Departed job site. 2:30 PM Returned to the job site for the purpose of visually inspecting the removal of debris and taking density tests on the street. Contractor was not ready for density tests. Departed job site. Inspeotor 1939 East Continental Boulevard Southlake, Texas 76092 (817) 329-0281 · (800) 348-6308 · Fax(817) 488-1866 I GEO - TECHNIQUE Date: //~ 4/~ ~/ Time: Company Name:... Fax Number: Attention: Subjecu Ft'OITg /~/.,-/) 59~- ~ -/g Number of pages including cover sheet: d 1939 East Continental Boulevard · Southlake, Texas 76092 (817) 329-0281 · (800) 348-6308 Fax (817) 488-1866 ~WHi~ YOU WERE AWAY~