PROJECT: Pecan Valley Addition
DATE= 10-14-91 DAY: Monday TEMPI
WEATHER: Clear & Mild
TIME INS 8~30 AM
WORKING CONDITIONS~ Good CONTRACTOR: SunWast Excavating,
JOB 2:90-366
LOW: 60F HIGH: 82F
RAINFALL (IN): None
TIME OUT: 4~30 PM
Inc.
Travelled to the job site. Inspected debris clean-up on Station
1+00 to 3+00 (second lift) of Pecan Hollow Drive. Approved for
watering and compaction. Inspected clean-up of Lots 4, 5 and 6 of
Block "B". Approved for watering and compaction. Contractor began
plaolng backfill on third lift of Pecan Hollow Drive between
Station 1+00 and 3+00. Inspected clean-up late. Not complete.
TO be inspected early A.M. Tuesday. Departed job site.
Inspector
1939 East Continental Boulevard · Southlakc, Texas 76092
(8t7) 329-0281 · (800) 348-6308 · Fax (817) 488-1866
GEO -
T CHmQU
NCo
"Excellence by Experience"
CONSULTING SPECIALISTS
Enviromnental Assessmenla
~lvlronmental En~neerirts
Soils & ~ou~on Eflgifl~in$
Cons~c~ Ma~i~s Tcsting
PROJECT: Pecan Valley Addition
JOB ~= 90-366
DATE: 10-15-91 DAY= Tuesday TEHP: LOW= 61F HIGH: 84F
WEATHER: Clear, Warm & Windy
RAINFALL (IN): None
TIME IN: 9:00 AM
T~ME OUT: 4:30 PM
WORKING CONDITIONS: Good CONTRACTOR: SunWest Excavating, Inc.
Travelled to the Job site. Upon arrival, inspected clean-up
activities of third lift of Pecan Hollow Drive, Station 1+00 to
3+00. Approved for watering, compaction and densitytestlng. Lots
4, 5, 6 and 7 were cleaned and rolled. These lots are now near
original grade'before trash removal. Contractor began drifting
dirt from Lots 2 and 3 onto Pecan Hollow Drive Station 1+00 to 3+00
for fourth lift. Not ready for inspection this P.M. To be
inspected early wednesday A.M. Departed job site.
lnepeotor
1939 East Continental Boulevard · Southlake, Texas 7609:2
(817) 3294281 · (800) 348-6308 · Fax(817) 488-1866
GEe -
TI ¢HNIQU
"Excellence by Experience"
p. EI4
CONSULTING SPECIALISTS IN:
l~nvimnmema[ As~ments
Envirorcm~n~l ]~glne~fing
Soils & Foundation Engineering
Constnmtion Materials T~sfing
Commercial & lndus~al Inspoction
PROJECT: Pecan Valley Addition
JOB ~: 90-366
DATEI 10-16-91 DAY= Wednesday TEMP: LOW: 58F HIGH: 88F
WEATHER~ Clear, Warm & Windy
RAINFALL (IN): None
TIME IN: 9:00 AM
TIME OUT: 4~30 l/~
WORKING CONDITIONS: Good CONTRACTOR: SunWest Excavating,
Travelled to the job site. Upon arrival, checked fourth lift on
Pecan Hollow Drive, Station 1+00 to 3+00. Not ready. Re-ripped
and picRed clean. Approved for watering, compaction and density
testing. Contractor has reached original grade on the excavation
of Lots 2 and 3 of Block ~*B". Began clean-up of surface of Lore
2 and 3. Inspected surface of fil! area on "eye-brow" between
Pecan Hollow Drive and Beaver Run, Station 6+80 to 7+50. Area
ripped, cleaned and approved for watering, compaction and deDsity
testing. Contractor began drifting dirt from north stockpile onto
Pecan Mellow Drive Station $+00 to 4+00 for fifth lift. Departed
Job site.
Louie L. Margie% P.E.
Inspector
1939 East Continental Boulevard Southlake, Texas 76092
(817) 329-0281 · (800) 348-6308 · Fax(817) 488-1866
GEO -
TgC tN QUE
INC.
CONSULTING SPECIALISTS IN:
Bnvironm~ntal
Environrr~ntal ~ngi~r]flg
~ils & Found~i~ Eng~i~
C~s~on Ma~ls
"Excellence by Experience"
PROJECT: Peoan Valley Addit$on
DATE: 10-17-91 DAYs Thursday
WEATHER= Clear~ Warm & Windy
TIME INs 9=30 AM
WORKING CONDITIONS:
JOB ~: 90-366
TEMP~ LOW: 58F HIGH~ 81F
RAINFAL~ (IN): None
TIM~ OUT: 4:30 PN
Good CONTRACTOR: SunWest Excavating, Inc.
Travelled to the job site. Upon arrlval, checked first li£t of
"eye-brow", Station 6+80 to 7+50. Needed additional cleaning.
Later approved for compaction. Inspected fifth lift o~ Pecan
Hollow Drive from Station 1+00 to 4+00. Approved for compaction.
Contractor re-ripped and undercut Lots 2 and 3, Block "B". Still
not clean. Contractor placed second lift on "eye-brow" and sixth
lift on Pecan Hollow Drive, Station 1+00 to 4+00. Approved "eye-
brow" olean-up for compaction and third lift. Pecan Hollow Drive,
Station 1+00 to 4+00 not ready. Check early A.M. Friday. Departed
Job eite.
Inspector
1939 East Continental Boulevard * Southlake, Texas 76092
(817) 329-0281 · (800) 348-6308 * Fax(817) 488-1866
GEe -
T c IQW
INC.
CONSULTING SPECIALISTS IN:
Bnviroameotal As~essrnent~
BavL~onm~atal ~S~
Soils & Fou~il~ Engining
Cons~c~ ~fi~s Testing
Comme~i~ & [nd~trial l~s~tion
"Excellence by Experience"
PROJECT: Pecan Valley Addition
DATE: 10-18-91 DAY: Friday
WEATHER: Clear, Warm & Windy
TIME IN: 8:30 AM
WORKING CONDITIONS:
JOB ~: 90-366
TEHP: LOW: 56F HIGH: 86F
RAINFALL (IN): None
TIME OUT: 4:30 PM
Good CONTRACTOR: SunWest Excavating, Inc.
Travelled to the job site. Inspected Pecan Hollow Drive, Station
1+00 to 4+00 seventh lift. Approved for watering and compaction.
contractor watered and compacted third lift on ~eye-brow" section.
Then placed fourth lift for cleaning. Later compacted seventh lift
on Pecan Hollow Drive, Station 1+00 to 4+00, then began drifting
fill from Station 1+00 to 5+00 for eighth lift. Checked "eye-brow"
section, forth lift, end approved clean-up for £1£th lift.
Contractor then watered and began compaction. Departed job site.
Several areas along Pecan Hollow Drive appear near final subgrade.
Contractor will work tomorrow (Saturday, 10-19-91).
Inspector
1939 East Continental Boulevard · Southlakc, Tcxas 76092
(817) 329-0281 · (800) 348-6308 · Fax (817)488-1866
GEo -
T .c mQU .
F'.O?
CONSULTING SPECIALISTS IN:
Bavkoamenta~ A~sments
Soils & Foun~ E~
~ial & lndua~ lns~tion
"Excellence b~ Expe~ence~
PRO~EC~ Pecan Va~e¥ ~di~ion
DATEg 10-19-91 DAY: Saturday
WEATHER: Clear & Warm
TIME IN: 10:30 AM
4:30 PM
WORKING CONDITIONS: Good
JOB $: 90-366
T]~4P: LOW; 58F EIGHg 78F
RAINFALL (IN): None
TIME OUT: 12:30 PM
6:30 PM
CONTRACTOR~ SunWest Excavating, Inc.
ACTIVITZ~S:
IO:30AM
Arrived on Job site for periodic inspection. Contractor
placing sixth lift on "eye-brow" section. Checked clean-
up of fill and approved for compaction. Checked Station
1+00 to 5+00 on Pecan Hollow Drive for clean-up.
Approved for compaction. Departed job site.
4:30
Returned to check progress. Contractor had placed
eeventh lift on "eye-brow". Not clean. Aleo had placed
additional fill in parts of Pecan Hollow Drive between
Station 2+50 and 5+00. Not clean. Departed job site.
Louis L. Hargis, P.E.
Inspector
1939 East Continental Boulevard · Southlake, Texa~ 76092
(817) 329-0281 ° (800) 348-6308 · Fax (817) 488-1866
GEO -
T cI QVE
INC.
P.08
CONSULTING SPECIALISTS IN:
~nvir~nrr~ntal Assessments
]~tviron~nt&l Engine~rln8
Soils & Pound,on ~
~ns~cti~ Ma~s T~In6
C~iM & lndus~i~ Ins~tinn
"Excellence by Experience"
PROJECT: Pecan Valley Addition
DATE: 10-21-91 DAY: Monday
WFJ~THER: clear & Wars
TIME IN: 10:30 AM
WORKING CONDITIONS: Good
JOB ~: 90-366
TEMP: LOW: 58F HIGH: 78F
RAINFALL (IN): None
TIME OUT: 3:30 PM
CONTRACTOR: SunWest Excavating, Inc.
Arrived on job site. Observed removal of foreign debris by hand
and pick ax o~ Pecan Hollow Drive from Station 1+00 thru 3+oov and
from Station 7+00 thru 7+75. Density tests taken of sixth and
eighth lifts from Station 1+00 thru 3+00. All tests passed.
Departed job site.
Shane Robinson
Inspector
1939 East Continental Boulevard · Southlake, Texas 76092
($17) 329-0281 · (800) 348-6308 * Pax (817) 488-186~
TECHNIQUE
INC.
CONSULTING SPECIALISTS IN:
Fmvironmeotal As,.,e~sments
l~nviromnen~ l~ngine~ri~
Soils & Pounclalion l~ngineering
Co~lst~uclion Mate~als Testing
Comm®reial & Industrial Inspect|on
"Excellence by Experience"
PRO.TECT: Peoan Valley Addition
DATEI 10-22-91 DAY:
WEATHER: Clear & Warm
TIIt~ IN: 8:00 AM
12:30 PM
3:00 PM
WORKZNG COND'rTTONS: Good
Tuesday
CONTRACTOR
JOB ~: 90-366
TEMPS LOW~ 60F HIGH: 80F
RAINFALL (IN): None
TIME OUT: 9:30 AM
1:30 PM
4500 PM
SunWest Excavating, Inc.
8:00 AM
Arrived on job eite for the purpose of visually
inspecting the red,oval of foreign debris and density
control on fill placement. No densitiee taken, the
oontr&otors water truck was removed from the project on
10-21-91. Departed job site.
12:30 PM
Returned to the job site, contractor still
debris, none of the areas ready for densities.
job site.
removing
Departed
3:00 PM
Returned to the job site. Collected one (1) soil sample
for the determination of the Standard Proctor. Departed
Job site.
Departed Job site.
Inepector
1939 East Continental Boulevard · Southlake, Texas 76092
(817) 329-0281 · (800) 348-6308 · Fax (817) 488-1866
GEO -
p. to
CONSUL TING SPECIALISTS IN:
Environmental As~sments
Environmental Eo~lneering
Soils & Foundation Engineering
Con.~ction Materials Testing
Commercial & Industrial Insp~tlon
"Excellence by Experience"
FIELD COMPACTION REPORT
PROJECT: Pecan Valley Estates
LOCATION: Coppell, Texas
CLIENT~ Everfine ! Cateway
JOB ~: 90-366
DATE= 10-21-91
TIME~ 10:30 AM - 3:30 PM
TEST
~0..
1
2
3
4
5
6
LOCATZON
AND L~FT
Pecan Hollow Dr. on
Station 1+10;
Pecan HO/lOW Dr. 6n
Station 1+10;
Pecan'~ollow Dr. 4'
Station 2+00;
Pecan Hollow Dr, 4'
Station 2+00;
Pecan Hollow Dr."3'
Station 2+90;
-- -~can Hollow Dr. 3'
Station 2+90;
CL ~
6th Lift
CL ~
8th Lift
Rt of CL
6th Lift
Rt of CL
8th Lift
6th Lift
Lt o£ CL
8th Lift
PROCTOR
NUMBER
(2)
(2)
(2)
(2)
WATER
CONT.
15.4
13.8
15.1
DRY'
DEN.
(PC~)
114.6
111.1
PER-
CENT
COMP.
98.0
97.0
15.6 110.4
(3) 1 .2 104.9 98.0
(3) 18.0 99.0
106.6
95.0
95.0
REMARKS:
All Tests Passed.
Minimum Compaction Required: 95.0%
PROCTORS:
(2) Reddish Brown & Gray Sand w/
(3) Brown & Tan Silty Clay
Clay
116.7 PCF @
107.1 PCF @
13,7% MOIST~I~
17.0% MOISTURE
Shane Robinson
INSPECTOR
1939 East Continental Boulevard · Southlake, Texas 76092
(817) 329-0281 · (800) 348-6308 · Fax(817) 488-1866
GEO -
TECHNIQUE
~NCL
CONSULTING SPECIALISTS IN:
Enviror~ent~ Assessments
3oils & Foun~fi~ ~gi~
~ns~ction Ma~fi~s Tes~
~e~l~ & lndus~al lns~fi~
"Excellence by Experience"
Date:
Time:
Company Name:
Fax Number: .....
Attention:
Subject:
From:
Number of pages including cover sheet: q
1939 East Continental Boulevard · Southlake, Texas 76092
(817) 329-0281 · (800) 348-6308 · Fax(817) 488-1866