Pecan Valley-LR 911023GEe - TEC tNIQUE INC. "Excellence by Experience" PROJECT: Pecan Valley Addition DATE= 10-14-91 DAY: Monday TEMPI WEATHER: Clear & Mild TIME INS 8~30 AM WORKING CONDITIONS~ Good CONTRACTOR: SunWast Excavating, JOB 2:90-366 LOW: 60F HIGH: 82F RAINFALL (IN): None TIME OUT: 4~30 PM Inc. Travelled to the job site. Inspected debris clean-up on Station 1+00 to 3+00 (second lift) of Pecan Hollow Drive. Approved for watering and compaction. Inspected clean-up of Lots 4, 5 and 6 of Block "B". Approved for watering and compaction. Contractor began plaolng backfill on third lift of Pecan Hollow Drive between Station 1+00 and 3+00. Inspected clean-up late. Not complete. TO be inspected early A.M. Tuesday. Departed job site. Inspector 1939 East Continental Boulevard · Southlakc, Texas 76092 (8t7) 329-0281 · (800) 348-6308 · Fax (817) 488-1866 GEO - T CHmQU NCo "Excellence by Experience" CONSULTING SPECIALISTS Enviromnental Assessmenla ~lvlronmental En~neerirts Soils & ~ou~on Eflgifl~in$ Cons~c~ Ma~i~s Tcsting PROJECT: Pecan Valley Addition JOB ~= 90-366 DATE: 10-15-91 DAY= Tuesday TEHP: LOW= 61F HIGH: 84F WEATHER: Clear, Warm & Windy RAINFALL (IN): None TIME IN: 9:00 AM T~ME OUT: 4:30 PM WORKING CONDITIONS: Good CONTRACTOR: SunWest Excavating, Inc. Travelled to the Job site. Upon arrival, inspected clean-up activities of third lift of Pecan Hollow Drive, Station 1+00 to 3+00. Approved for watering, compaction and densitytestlng. Lots 4, 5, 6 and 7 were cleaned and rolled. These lots are now near original grade'before trash removal. Contractor began drifting dirt from Lots 2 and 3 onto Pecan Hollow Drive Station 1+00 to 3+00 for fourth lift. Not ready for inspection this P.M. To be inspected early wednesday A.M. Departed job site. lnepeotor 1939 East Continental Boulevard · Southlake, Texas 7609:2 (817) 3294281 · (800) 348-6308 · Fax(817) 488-1866 GEe - TI ¢HNIQU "Excellence by Experience" p. EI4 CONSULTING SPECIALISTS IN: l~nvimnmema[ As~ments Envirorcm~n~l ]~glne~fing Soils & Foundation Engineering Constnmtion Materials T~sfing Commercial & lndus~al Inspoction PROJECT: Pecan Valley Addition JOB ~: 90-366 DATEI 10-16-91 DAY= Wednesday TEMP: LOW: 58F HIGH: 88F WEATHER~ Clear, Warm & Windy RAINFALL (IN): None TIME IN: 9:00 AM TIME OUT: 4~30 l/~ WORKING CONDITIONS: Good CONTRACTOR: SunWest Excavating, Travelled to the job site. Upon arrival, checked fourth lift on Pecan Hollow Drive, Station 1+00 to 3+00. Not ready. Re-ripped and picRed clean. Approved for watering, compaction and density testing. Contractor has reached original grade on the excavation of Lots 2 and 3 of Block ~*B". Began clean-up of surface of Lore 2 and 3. Inspected surface of fil! area on "eye-brow" between Pecan Hollow Drive and Beaver Run, Station 6+80 to 7+50. Area ripped, cleaned and approved for watering, compaction and deDsity testing. Contractor began drifting dirt from north stockpile onto Pecan Mellow Drive Station $+00 to 4+00 for fifth lift. Departed Job site. Louie L. Margie% P.E. Inspector 1939 East Continental Boulevard Southlake, Texas 76092 (817) 329-0281 · (800) 348-6308 · Fax(817) 488-1866 GEO - TgC tN QUE INC. CONSULTING SPECIALISTS IN: Bnvironm~ntal Environrr~ntal ~ngi~r]flg ~ils & Found~i~ Eng~i~ C~s~on Ma~ls "Excellence by Experience" PROJECT: Peoan Valley Addit$on DATE: 10-17-91 DAYs Thursday WEATHER= Clear~ Warm & Windy TIME INs 9=30 AM WORKING CONDITIONS: JOB ~: 90-366 TEMP~ LOW: 58F HIGH~ 81F RAINFAL~ (IN): None TIM~ OUT: 4:30 PN Good CONTRACTOR: SunWest Excavating, Inc. Travelled to the job site. Upon arrlval, checked first li£t of "eye-brow", Station 6+80 to 7+50. Needed additional cleaning. Later approved for compaction. Inspected fifth lift o~ Pecan Hollow Drive from Station 1+00 to 4+00. Approved for compaction. Contractor re-ripped and undercut Lots 2 and 3, Block "B". Still not clean. Contractor placed second lift on "eye-brow" and sixth lift on Pecan Hollow Drive, Station 1+00 to 4+00. Approved "eye- brow" olean-up for compaction and third lift. Pecan Hollow Drive, Station 1+00 to 4+00 not ready. Check early A.M. Friday. Departed Job eite. Inspector 1939 East Continental Boulevard * Southlake, Texas 76092 (817) 329-0281 · (800) 348-6308 * Fax(817) 488-1866 GEe - T c IQW INC. CONSULTING SPECIALISTS IN: Bnviroameotal As~essrnent~ BavL~onm~atal ~S~ Soils & Fou~il~ Engining Cons~c~ ~fi~s Testing Comme~i~ & [nd~trial l~s~tion "Excellence by Experience" PROJECT: Pecan Valley Addition DATE: 10-18-91 DAY: Friday WEATHER: Clear, Warm & Windy TIME IN: 8:30 AM WORKING CONDITIONS: JOB ~: 90-366 TEHP: LOW: 56F HIGH: 86F RAINFALL (IN): None TIME OUT: 4:30 PM Good CONTRACTOR: SunWest Excavating, Inc. Travelled to the job site. Inspected Pecan Hollow Drive, Station 1+00 to 4+00 seventh lift. Approved for watering and compaction. contractor watered and compacted third lift on ~eye-brow" section. Then placed fourth lift for cleaning. Later compacted seventh lift on Pecan Hollow Drive, Station 1+00 to 4+00, then began drifting fill from Station 1+00 to 5+00 for eighth lift. Checked "eye-brow" section, forth lift, end approved clean-up for £1£th lift. Contractor then watered and began compaction. Departed job site. Several areas along Pecan Hollow Drive appear near final subgrade. Contractor will work tomorrow (Saturday, 10-19-91). Inspector 1939 East Continental Boulevard · Southlakc, Tcxas 76092 (817) 329-0281 · (800) 348-6308 · Fax (817)488-1866 GEo - T .c mQU . F'.O? CONSULTING SPECIALISTS IN: Bavkoamenta~ A~sments Soils & Foun~ E~ ~ial & lndua~ lns~tion "Excellence b~ Expe~ence~ PRO~EC~ Pecan Va~e¥ ~di~ion DATEg 10-19-91 DAY: Saturday WEATHER: Clear & Warm TIME IN: 10:30 AM 4:30 PM WORKING CONDITIONS: Good JOB $: 90-366 T]~4P: LOW; 58F EIGHg 78F RAINFALL (IN): None TIME OUT: 12:30 PM 6:30 PM CONTRACTOR~ SunWest Excavating, Inc. ACTIVITZ~S: IO:30AM Arrived on Job site for periodic inspection. Contractor placing sixth lift on "eye-brow" section. Checked clean- up of fill and approved for compaction. Checked Station 1+00 to 5+00 on Pecan Hollow Drive for clean-up. Approved for compaction. Departed job site. 4:30 Returned to check progress. Contractor had placed eeventh lift on "eye-brow". Not clean. Aleo had placed additional fill in parts of Pecan Hollow Drive between Station 2+50 and 5+00. Not clean. Departed job site. Louis L. Hargis, P.E. Inspector 1939 East Continental Boulevard · Southlake, Texa~ 76092 (817) 329-0281 ° (800) 348-6308 · Fax (817) 488-1866 GEO - T cI QVE INC. P.08 CONSULTING SPECIALISTS IN: ~nvir~nrr~ntal Assessments ]~tviron~nt&l Engine~rln8 Soils & Pound,on ~ ~ns~cti~ Ma~s T~In6 C~iM & lndus~i~ Ins~tinn "Excellence by Experience" PROJECT: Pecan Valley Addition DATE: 10-21-91 DAY: Monday WFJ~THER: clear & Wars TIME IN: 10:30 AM WORKING CONDITIONS: Good JOB ~: 90-366 TEMP: LOW: 58F HIGH: 78F RAINFALL (IN): None TIME OUT: 3:30 PM CONTRACTOR: SunWest Excavating, Inc. Arrived on job site. Observed removal of foreign debris by hand and pick ax o~ Pecan Hollow Drive from Station 1+00 thru 3+oov and from Station 7+00 thru 7+75. Density tests taken of sixth and eighth lifts from Station 1+00 thru 3+00. All tests passed. Departed job site. Shane Robinson Inspector 1939 East Continental Boulevard · Southlake, Texas 76092 ($17) 329-0281 · (800) 348-6308 * Pax (817) 488-186~ TECHNIQUE INC. CONSULTING SPECIALISTS IN: Fmvironmeotal As,.,e~sments l~nviromnen~ l~ngine~ri~ Soils & Pounclalion l~ngineering Co~lst~uclion Mate~als Testing Comm®reial & Industrial Inspect|on "Excellence by Experience" PRO.TECT: Peoan Valley Addition DATEI 10-22-91 DAY: WEATHER: Clear & Warm TIIt~ IN: 8:00 AM 12:30 PM 3:00 PM WORKZNG COND'rTTONS: Good Tuesday CONTRACTOR JOB ~: 90-366 TEMPS LOW~ 60F HIGH: 80F RAINFALL (IN): None TIME OUT: 9:30 AM 1:30 PM 4500 PM SunWest Excavating, Inc. 8:00 AM Arrived on job eite for the purpose of visually inspecting the red,oval of foreign debris and density control on fill placement. No densitiee taken, the oontr&otors water truck was removed from the project on 10-21-91. Departed job site. 12:30 PM Returned to the job site, contractor still debris, none of the areas ready for densities. job site. removing Departed 3:00 PM Returned to the job site. Collected one (1) soil sample for the determination of the Standard Proctor. Departed Job site. Departed Job site. Inepector 1939 East Continental Boulevard · Southlake, Texas 76092 (817) 329-0281 · (800) 348-6308 · Fax (817) 488-1866 GEO - p. to CONSUL TING SPECIALISTS IN: Environmental As~sments Environmental Eo~lneering Soils & Foundation Engineering Con.~ction Materials Testing Commercial & Industrial Insp~tlon "Excellence by Experience" FIELD COMPACTION REPORT PROJECT: Pecan Valley Estates LOCATION: Coppell, Texas CLIENT~ Everfine ! Cateway JOB ~: 90-366 DATE= 10-21-91 TIME~ 10:30 AM - 3:30 PM TEST ~0.. 1 2 3 4 5 6 LOCATZON AND L~FT Pecan Hollow Dr. on Station 1+10; Pecan HO/lOW Dr. 6n Station 1+10; Pecan'~ollow Dr. 4' Station 2+00; Pecan Hollow Dr, 4' Station 2+00; Pecan Hollow Dr."3' Station 2+90; -- -~can Hollow Dr. 3' Station 2+90; CL ~ 6th Lift CL ~ 8th Lift Rt of CL 6th Lift Rt of CL 8th Lift 6th Lift Lt o£ CL 8th Lift PROCTOR NUMBER (2) (2) (2) (2) WATER CONT. 15.4 13.8 15.1 DRY' DEN. (PC~) 114.6 111.1 PER- CENT COMP. 98.0 97.0 15.6 110.4 (3) 1 .2 104.9 98.0 (3) 18.0 99.0 106.6 95.0 95.0 REMARKS: All Tests Passed. Minimum Compaction Required: 95.0% PROCTORS: (2) Reddish Brown & Gray Sand w/ (3) Brown & Tan Silty Clay Clay 116.7 PCF @ 107.1 PCF @ 13,7% MOIST~I~ 17.0% MOISTURE Shane Robinson INSPECTOR 1939 East Continental Boulevard · Southlake, Texas 76092 (817) 329-0281 · (800) 348-6308 · Fax(817) 488-1866 GEO - TECHNIQUE ~NCL CONSULTING SPECIALISTS IN: Enviror~ent~ Assessments 3oils & Foun~fi~ ~gi~ ~ns~ction Ma~fi~s Tes~ ~e~l~ & lndus~al lns~fi~ "Excellence by Experience" Date: Time: Company Name: Fax Number: ..... Attention: Subject: From: Number of pages including cover sheet: q 1939 East Continental Boulevard · Southlake, Texas 76092 (817) 329-0281 · (800) 348-6308 · Fax(817) 488-1866