Loading...
Pecan Valley-CS 910925..--~ /-~--'~ The City With A Beautiful Future September 25, ].991 · Mr. Bill Leeming Lesming Peterman / -~e~: Pecan Vall_k93_and Pecan Ri(a~ ~s %. Dear M~. Leeming: P.O. Box 478 Coppell, Texas 75019 214-462-0022 i'¢f .........IIII V"ORKS We are enclosing two (2] marked-up sets of construction plans of the screening wail, landscaping and irrigation plan for the Pecan Valley and Pecan Ridge Estates additions to the City of Coppell. Please make the corrections noted and return the mark-ups with your next submittal. From the irrigation plans, the water impact fee is calculated as follows: PECAN VALLEY PECAN RIDGE ESTATES Lodge Road 1" meter = $1,650, Pecan Valley Ct. 3/4" meter = $660 Pecan Hollow Dr. 3/4" meter = $660 Oak Crest Ct. 3/4" meter=S660 Sandy Lake Rd. 1" meter =$1,650, Lodge Rd. 1" meter = $1,650, TOTAL 82,970 TOTAL 83,960 *2.5 ESU X $660 Per ESU = $1,650 Please provide a ch~ck in the amounts indicated above made payable to the City of Coppell an8 forward it to the attention of Ms. Carolyn Beberfaeyer, Finance Department. The water impact fees must be paid prior to release of the irrigation plans for construction. Please submit a copy of your paid receipt to this office. If yoa have any questions, please contact Ben dela Cruz, Engineering T6chnician, or myself at 393-1016. Sincerely, ._~ ~ M. Shohre D/aneshmand, P.E. ~__ Acting C?~ Engineer : ~/~ . , ub ic Works Taryon Bowman, Planning Bill Anderson, D~ M. Dowdey ~ Assoc. CC: Ron Fraze, Gateway USA Carolyn Bebermayer, Finance