Loading...
Pecan Valley-CS 910517project. Water Impact Fee: 52 - 5/8" z $/4" Domestic Heter/s = Irrigation Weter/a = Fireline Meter/s = ESU's ESU's Total 52 ESU's ~ $660.00 ea = $34.320.00 100% due prior to Council approval of final plat. WastetFater Z~aot Fee: 52 - 5/8" z $/4" Domestic Heter/s = 52ESU's ~ $422.00 = 821.944.00 100% due prior to Council approval of final plat. *Note= If property to be developed is in the Coppell Wunicipal Utility District #1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City andWUD. Water Tap Znspeution Fee 52 Conneotions ~ $100.00 each - 35.200,00 100% due prior to issuance of building permit. Sewer Tap Inspe~ionFee 52 Connections ~ $I00.00 each = $~,200.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note= This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60per light will be assessed. street Signs Pee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park 52 Residential Lots at $150.00 each ~ $?,800.00 Units (Hulti family) at $75.00 each 50% of the amount specified above shall be paidby the Developer~ prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such t~me building permit is issued. Please advise the Developer of these fees and due dates. as a If you have any questions regarding these assessments please advise. cc= Steven G. Goram, Director of Public Works DE~ELFEE . HLP for ~ec~n Valley ST~,RRT SIGN ASSESS~IENT The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE OUANTITY No Parking $ 53.10 Speed Limit $ 63.54 I0 $ 635.40 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 Stop & Street Combo $ 96.85 3 $ 290.55 OTHER Yield/Street Combo $ 90.29 1 $ 90.29 street $ 57.72 1 $ 57.72 No Outlet $ 58.56 I $ 58.56 * Cost breakdowns maybe obtained from Public Works bywritten request. Revised4/1~91