Pecan Valley-CS 910517project.
Water Impact Fee:
52 - 5/8" z $/4"
Domestic Heter/s =
Irrigation Weter/a =
Fireline Meter/s =
ESU's
ESU's
Total 52 ESU's ~ $660.00 ea = $34.320.00
100% due prior to Council approval of final plat.
WastetFater Z~aot Fee:
52 - 5/8" z $/4" Domestic Heter/s = 52ESU's ~ $422.00 = 821.944.00
100% due prior to Council approval of final plat.
*Note= If property to be developed is in the Coppell Wunicipal
Utility District #1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City andWUD.
Water Tap Znspeution Fee
52 Conneotions ~ $100.00 each - 35.200,00
100% due prior to issuance of building permit.
Sewer Tap Inspe~ionFee
52 Connections ~ $I00.00 each = $~,200.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note= This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60per light will be assessed.
street Signs Pee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park
52 Residential Lots at $150.00 each ~ $?,800.00
Units (Hulti family) at $75.00 each
50% of the amount specified above shall be paidby the Developer~
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such t~me
building permit is issued.
Please advise the Developer of these fees and due dates.
as a
If you have any questions regarding these assessments please
advise.
cc= Steven G. Goram, Director of Public Works
DE~ELFEE . HLP
for ~ec~n Valley
ST~,RRT SIGN ASSESS~IENT
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN
UNIT PRICE OUANTITY
No Parking $ 53.10
Speed Limit $ 63.54 I0 $ 635.40
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60
Stop & Street Combo $ 96.85 3 $ 290.55
OTHER
Yield/Street Combo $ 90.29 1 $ 90.29
street $ 57.72 1 $ 57.72
No Outlet $ 58.56 I $ 58.56
* Cost breakdowns maybe obtained from Public Works bywritten
request.
Revised4/1~91