Loading...
Pecan Valley-CS 910401DATE: TO: FROM: HE: COPPELL PUBLIC WORKS Development e Pecan Valle The following fees should be assessed on the above referenced project. Water Impact Fee: 52 - 5/8"x3/4" N/A - N/A N/A - N/A Domestic Meter/s = 52 ESU's Irrigation Meter/s = N/A ESU's Fireline Meter/s = N/A ESU's Total 52 ESU's ~ $660.00 ea = $34,320.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: 52 - 5/8"x3/4" Domestic Meter/s = 52 ESU's ~ $422.00 = $21,944.00 100% due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District %1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection Fee 52 Connections @ $100.00 each = $5,200.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee 52 Connections 6.$100.00 each = $5,200.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 52 Residential Lots at $150.00 each = $7,800.00 N/A Units (Multi family) at $75.00 each = N/A 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works PECANVLY.HLP for STREET SIGN ASSESSMENT PECAN VALLEY The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE NO Parking $53.10 - Speed Limit $63.54 11 698.94 Yield $58.56 1 58.56 Stop $65.12 - Street Name $11.60 1 11.60 Stop & Street Combo $96.85 5 484.25 OTHER No Outlet $63.54 1 63.54 TOTAL $1,316.89 * Cost breakdowns may be obtained from Public Works by written request.