Riverchase(3)-CS 920821COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
August 21, 1992
Larry Davis, Construction Inspector~
Rey Gonzales, Street Sugerintendent ~/
Walk Through Punch List - Riverchase
The following is a list of discrepancies found on this project:
Rout and seal Median nose at Riverchase and Sandy
Lake (north end).
Chip out curb and repair several joints south of
Sandy Lake on both sides of road.
Need to install redwood header curb sections at all
header locations.
Seal inlet throats (all).
Seal all curb joints.
Continue control joints through repair on south end.
Please make sure the contractor receives a copy of this list and
contact me for the follow-up.
RG/bc
cc: Central File
STPLRIVE.RG