Loading...
Riverchase(3)-CS 880624 ~ The City With A Beautiful Future June 24, 1988 Jean Maier Nathan D. Maier Consulting Eng., Three Northpark 8800 N. Central Expwy. Suite 300 Dallas, Texas 75231 P.O. Box 478 Coppell, lexas 75019 214 - 462 - 0022 RE: Final walk Dear Jean: through inspection for Riverchase Phase I On 6/16/88, the City of Coppell performed a final walk through inspection for Riverchase Dr. Phase I. The following items will need to be resolved prior to acceptance of this project: Water Utility Department 5 + 00 Clean invert of manhole of marked curb 7 + 00 Valve on north side of street needs 4' extension 7 + 00 Valve on south side of street needs to be cleaned OUt 9 + 50 Install plug in C. 0. 19 + 98 Locate Line "C" C. O. 12 + 00 Valve on north side of street needs 4' extension 15 + 00 Manhole Line "C" clean invert 17 + 00 Valve on north side of street needs 4' extension 10 + 00 Manhole Line "C" clean invert 22 + 00 Valve on north side of street needs 4' extension 24 + 55 (Fairway Dr.) Valve on north side of street, paint lid 27 + 00 Valve on north side of street needs 4' extension 33 + 55 Valve on south side of street needs to be reset and needs 4' extension Street Department 69 + 25 Patch and mud ball hole Reseal expansion joint 59 + 90 Repair broken concrete rip-rap Clean dirt out of pipe 38 + 89 Clean out both inlets Fire Department 1) Ail fire hydrants need to be oiled 2) Fire hydrant 2 + 00 needs repainting Developmental Inspections Department 1) Construction of wall on north side of Riverchase Drive and golf course 2) Construction of sidewalk south side of Riverchase Drive If you have any questions, please feel free to contact me at 462-8495. Thank y, ou, .::-' i.~" Steven M. Morton ...... -- Chief Deve 1 opmen t a 1 - In'~'~-~or SMM / bb cc: Steve Gor~,~Dlrector of Public Works