Riverchase(3)-CS 880329COPPELL PUBLIC WORKS
March 29, 1988
TO:
IR )M
Taryon Bowman,
Steven Morton,
Fairway Drive
Planning & Zoning Coordinator
Chief Public Works Inspector~7
- Final Plat
After reviewing the above referenced item with Public Works
Supervisors, please find below items which will need to be resolved
prior to final plat acceptance:.
Show proposed railroad crossing to Beltline Rd. on plat.
Existing Fairway
Railroad pads to
Water main to
Drive.
Drive to be used as a multi-family entry.
extend to R.O.W. line.
be installed prior to construction of
Fairway
No Homeowner's Maintenance Agreement is required.
The only fees applicable are street light and
prior to final acceptance.
street
sign,
due
]f you need further information,
SMM/sm
cc: Steve Goram
Richard Diano
Per Birdsall
Howard Pafford
please advise.