Loading...
WA9801-CS 990823 (2)CONSULTING ENGINEERS 8333 DouglasAvenue,#820 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. Dallas, Texas 75225-5816 Fax (214) 361~/~home (214) 3_~61-7900 August 23, 1999 Mr. Kenneth Griffin, P.E. City of ppell Post me Box 478 : te.ighway lWat ine GTE Conflict Dear Mr. Griffin: As requested by Mr. Larry Davis, we have discussed the possibility of constructing the proposed State Highway 121 water line by boring in those areas in conflict with the recently installed GTE underground telephone cable. The contractor, H & W Utility Contractors has submitted a written proposal for the extra work in the amount of $186.50 per linear foot for installing the 12-inch water line by boring. Of course, this new pay item would replace the current pay item for installation by open cut in this same location. The net result is a contact increase in the range of $49,000, depending on the actual length of the bore required. We are enclosing a copy of the proposal for your consideration and records. In addition, the contractor has submitted a written request that the contract time be suspended as of Monday, August 9, 1999 due to the GTE conflicts and that seven additional days be added to the contract time. We offer no objection to this request and recommend the City consider formalizing the time extension in a change order to the contract. We are available to discuss this project further at your convenience. Sincerely yours, ?~..clos; Larry Davis 7 ! I H & W UTILITY CONTRACTORS August 19, 1999 Mr. Gary C. Hendricks, P.E. Shimek, Jackobs & Finklea, L.L.P. 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 State Highway 121 Water llne Project No. WA-98-01; Bid No. Q:0199-02 Dear Gary: We respectfully request that the contract days~,uspended as of Monday, August 9, 1999, due the conflict with GTE phone cables. We would also like to request an additional seven days be added to the contract time for the period of time we pulled offthe job for the emergency repairs requested by the City of Coppell. Sincerely, 30$ Main Street . Lake DaBas, Texas T~06S Metro (940) 321-S158 · FAX Metro (940) 321-5160 88/,28/19S9 89:34 g483215168 H&W UTILITIES Date: To; Fwm: H & W UTILITY CONTRACTORS 305 Main St., Lake Dallas, Texas 75065 (940)321-5158 - Fax (940)321-5160 E-mail - hwuc~ash.net MEMORANDUM August 20, 1999 Gary Hendricks Mike Haynes 214-361-0204 Bore for GTE ~ Coppell Project Gary: The cost for doing a bore to get under the GTE cable would be as follows: Add 300 lfof Bvre for 12" water under phone cable - $186.50 If D~duct 300 If 12" water line, open cut 23.42 Net change $55,950.00 7,026.00 $48,924.00