Riverchase(3)-CS 870903NDM NATHAN D. MAIER CONSULTING ENGIN£EI~S, INC. September 3, 1987 Mr. Wayne Oinn Oinn, Inc. 17103 Preston Road, Suite 100 Dallas, TX 75248 Re: MacArthur Blvd. - 24" Water Main NDM No.: 84-7-038 Dear Mr. Oinn: Reference is made to your July 23, 1987, letter to Ms. Janet P. Vick of our firm regarding additional reimbursement due Riverchase Joint Venture in conjunction with the above referenced project. In your letter, you stated that as soon as Mr..Steve Goram returned from vacation, you ~ould discuss this ~dditional reimbursement matter with him (please refer to Ms. Vick's letter to you dated June 24, 1987, for specifics related to the request for additional reimbursement). It has been over a month since we received your letter. We would greatly appreciate your attention to this matter so that it can be resolved as soon as possible. Please do not hesitate to call should you need any additional informa- tion. Sincerely, Jm/rdp cc: Mr. Alan D, Ratli£f Mr, Jay Patterson Mr, Mike Daniel NATHAN D. MAIER CONSULTING ENGINEERS, INC. Three Northi)&rk/8800 N. Centrll Expw¥./Sulte 500/DiIIBi, Texll 75231/(314) 739-4741 GINN, INC. July 23, 1987 CONSULTING ENGINEERS Ms. Janet P. Vick Nathan D. Meier Consulting Engineers 8800 N. Central Expressway, #300 Dallas, Texas 75231 Re: MacArthur Blvd. - 24" Water Main Dear Ms. Vick: We are currently reviewing your request of June 24, 1987 regarding extra compensation to Terra for the 24" water line along MacArthur. As soon as Mrs. Steve Goram returns from vacation, we will request his verification of the "extras" ~nd proceed to advise the city manager. Your patience during this review time is appreciated. Sincerely, H. Wayne Ginn, P.E. cc: Jay Patterson, Terra Mike Daniel, Terra Alan Ratliff, City Mgr. w/attachments 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 NDM NATHAN D. MAIER CONSULTING ENGINEERg, INC. June 24, 1987 Hr. Wayne Glnn Clnn, Inc. 17103 Preston Road, Dallas, TX 75248 Suite 100 Re: HacArthur Blvd. 24" Water Hain NDH No.: 84-7-038 Dear Wayne: Please find enclosed a copy of the original bid tabulation for utilities on the above referenced project, and a copy of the letter forwarded to the City of Coppell and Record Drawings. As per our discussion, we originally bid RCCP pipe instead of D.I. pipe, and the $92,430.50. approved by the City Council-was for RCCP pipe. Steve .Corham insisted that D.I. pipe be used. The cost difference is $11.00 per linear foot; the change in pipe type cost is $28.435.00. The additional cost above this amount is due to a increase in length of pipe by 325 feet, and additional valves and manholes. The 24' main was extended further north so ~hat the stub out would be outside the power ease- menta, and extending the main east and west along Belt Line Road. The cost due to ~he additional length, valves, and manholes is $13,125.00. This cost, together with the pipe type cos~, totals $41,560 still due Rlverchase Joint Vent~tre. Your assistance in helping resolve this matter will be greatly appreci- ated. If you need any additional information to process the reimbursement, please do not hesitate to call me. Sincerely, JPV/rdp Enclosures cc: Jay~atterson - Terra Land Development Hike Daniel - Terra Land Development Three NorthPark/8800 N. Central Expw~;./Selte 300/Dellao, Texas 752311(214) 139-4741