Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST9302-CR000215
CONSTRUCTION' , OR'S DAILY REPORT ( OF DALLAS WATER DEPARTMENT HOURS;. WORK DAY ( · JYES) ( NO, WHY?) I of-/ ©CATION OF LINE ?..¥v ~'o.¢,J 1¢,~6' ~, QJ Ai'.;1 ;'i-Y ITEM STATION ITEM Ft. Pipe: Size Type ,- Ft. Class Emb. in Rock ' Ft. Class Emb. in Earth Ft, Class Gr. Mat'l Ft. Polyethylene Wrap . Ft. Pipe: Size J Type / , :: ' Ft. Class Emb. in Rock Ft. Class ,Emb, in Earth Ft. Class Gr Mat'l Ft. Polyethylene Wrap EAD HEAD SERVICES INSTALLED IT'¢ [ SIZE BLOCK LOT NO. ITEM EA. INCH ~A. INCH VALVES, FIRE HYDRANTS, PAVING, ETC. 'NUMBER _ Ft _ Ft. Rock #Concrete For: Foundation c/C~ Stab Backfill Inches Thick Over Inches Thick Over DESCRIPTION 'Pipe: Stations:" Pipe: Stations: Location: Location: .. Location: ITEM Hg PROGRESS OF BACK-FILL AND CLEAN-UP WORK SATISFACTORY? ~'/~'"'~--) ARE ALL DITCHES AND OTHER OBSTRUCTIONS AND HAZARDS TO PUBt (Y, $ OR NO} th.~ Contr.~ctor: -- I ag 'ee that the above report is correctwith thefollowing exceptions: