Loading...
ST9302-CR000228lATER MAIN CONSTRUCTION i,~$PECTOR'S DAILY REPORT CITY OF DALLAS WATER DEPARTMENT ..o / o, / ~NTITY ITEM STATION Ft. Pipe: Size .Type Ft, Class Emb, in Rock Ft. Class Emb. in EaCh Ft, Class Gr. Mat'l Ft. Polyethylene Wrap Ft, Pipe: Size Type Ft. Class Emb. in Rock Ft. Class ..Emb. in EaCh Ft. Class Gr Mat'l Ft. Polyethylene Wrap AD HEAD SERVICES INSTALLED UAhlTITY SIZE BLOCK EA. INCH EA. INCH TINGS, VALVES, FIRE HYDRANTS, PAVING, ETC. NUMBER LOT NO. DESCRIPTION Ft Inches Thick Over __ Ft, Inches Thick Over Rock #Concrete For: Cy Foundation Location: Cy Stab. Backfill Location: Pipe: Stations: Pipe: Stations: ~.ocation: ITEM # ITEM # PROGRESS OF BACK-FILL AND CLEAN-UP WORK SATISFACTORY? ~?~''~;~'~ {YES OR NO) TY pROPERLY BARRICADED? \,I~'~ NO. PERSONS WORKING ON JOB~ tYF~ OR NO) ARE ALL DITCHES AND~THER OBSTRUCTIONS AND HAZARDS TO PUBLI ,~ COMMENTS: the CGntractor: -- I agree that the above report is correctwith thefollowing exceptiohs!;, WTU-01129