Loading...
Riverchase(3)-CS 870504Trinity River Authority of Texas Central Regional Wastewater System 3110.620 May 4, 1987 H. Wayne Ginn City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Subject: Central Regional Wastewater System Coppell Interceptor Riverchase Point of Entry Dear Mr. Ginn: In response to the point of entry request dated April 21, 1987, the Authority has reviewed the construction standards to be utilized on the point of entry at station 130+98. The Authority approves your request based upon the information submitted which includes the construction plans for Riverchase Development by Nathan D. Maier dated November 1985, but is subject to the following requirements. Central Regional Wastewater System Engineering Division must be contacted {214 263-2251 or 214 262-5186) at least 72 hours prior to construction. If the Authority is not notified the Authority reserves the right to request the contractor to excavate his work. All inspections will be performed only by Authority inspectors. City inspectors are not responsible for Trinity River Authority property. 2. All points of entry must be constructed within one year after their acceptance by the Authority. Any alterations to the plans concerning the Authority's interceptors, meter stations, point of entries or easements must also be approved by the Authority. 3. A preconstruction meeting with the contractor and the Authority is required prior to construction. PO Box 531196 Grand Pra r e, Texas 75053 (214) Metro 263-2251 Trinity River A-thority of Texas Central Regiom astewater System P.O. Box 531196 6500 West Singleton Blvd. Grand Prairie. Texas 75053 1214) 263-225t-(214) 262-5186 To: - /' / t.X~--~ , , WE ARE SENDING YOU [] Attached ~- Under separate cover via ~ Shop drawings ~ Mylars, sepia plans ~ Copy of le~er ~ Chan~e order L THESE ARE TRANSMI~ED as check~ below: For approval ~ Approved as submitted ~For your use ~ Approved as noted /~,As requested [] Returned for corrections PLANS TO BE RETURNED BY ._ _ _ the follAJ~'.~gI items: ~ Spec~ifications For review and comment FOR BIDS DUE . 19 . _ PRINTS RETURNED AFTER LOAN TO US 4 REMARKS__ COPY TO.. 71001 REV 87 Trinity River Authority of Texas Central Reglonel Wastewater System 3110.620 May 4, 1987 H. Wayne Ginn City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Subject: Central Regional Wastewater System Coppell Interceptor Riverchase Point of Entry Dear Mr. Ginn: In response to the point of entry request dated April 21, 1987, the Authority has reviewed the construction standards to be utilized on the point of entry at station 130+98. The Authority approves your request based upon the information submitted which includes the construction plans for Riverchase Development by Nathan D. Maier dated November 1985, but is subject to the following requirements. Central Regional Wastewater System Engineering Division must be contacted {214 263-2251 or 214 262-5186) at least 72 hours prior to construction. If the Authority is not notified the Authority reserves the right to request the contractor to excavate his work. All inspections will be performed only by Authority inspectors. City inspectors are not responsible for Trinity River Authority property. All points of entry must be constructed within one year after their acceptance by the Authority. Any alterations to the plans concerning the Authority's interceptors, meter stations, point of entries or easements must also be approved by the Authority. 3. A preconstruction meeting with the contractor and the Authority is required prior to construction. P.O. Box 531196 Grand Prairie, Texas 75053 {214) Metro 263-2251 May 4, 1987 Wayne Ginn Page 2 4. All P.V.C. connections shall use A.C. pipe adaptors. 5. Connections to the interceptor shall be by sawcut or core drill method only. Jack hammering will not be allowed. o The Authority's interceptor is encased from Station 129+00 to Station 131+00. A standard manhole does not apply here therefore a shop drawing of the proposed manhole must be submitted prior %o construction of the manhole. The Authority recommends all incoming point of entry flow lines should be at least above the spring line of the Authority's interceptor, preferably above the crown. The Authority is not responsible for overflow resulting from connections below the recommended distance from the flow line of the Authority's interceptor. This point of entry shall serve the City of Coppell and will be metered at Meter station 17.0E. In addition to this, personnel from the Engineering Division must be onsite during construction, as well as prior to any backfilling of the Authority's facility in this area. If you have any questions or comments please contact me. Joan B. McNamee Technical Services Engineer cc: John Kirkpatrick, Engineering Technician Janet Vick, Nathan D. Maier INITY RIVER AUTItORITY OF TEXA¢ NORTHERN REGION PROJECTS REQUEST FOR A POINT OF ENTRY ATTACHNENT A CONTRACTING PARTY: PROPOSED PROJECT NAME: DESIGN ENGINEER: CONTACT: Janet Vick City of Copp~L1 Riverchase Nathan D. Maier Consulting Engineers, Inc. TELEPHONE NO. 739-474l ' LOCATION OF PROPOSED CONNECTION (TRA NOMENCLATURE). NOTE: DETAILS CONCERNING TRA INTERCEPTORS ARE AVAILABLE FROM THE PROJECT'BUT SHOULD BE VERIFIED IN THE FIELD PRIOR TO SUBMITTAL. PROJECT CRWS x TMC INTERCEPTOR: Coppell Interceptor STATION NO.: 130 + 98 PLANNED LAND USE FOR THE AREA TO BE SERVED: · ACREAGE: 221± Acres 93% Residential 7% Commercial INITIAL FLOW EXPECTED: o ULTIMATE FLOW EXPECTED: 1.3 BASIS FOR ESYABLISHING FLOWS: MGD (DAILY AVERAGE) 0 MGD (PEAK) MGD (DAILY AVERAGE) 3.38 MGD (PEAK) Based on 3.6 people/unit as per zonin9 density., for average daily flow. Peak flow equals 2.5 times average daily flow plus infiltration. Infiltration of 500 GPD/ncre. TYPE OF CONNECTION: EXISTING MANHOLE: SIZE OF CONNECTION: MATERIAL OF CONNECTION: 15 Pvc CONSTRUCT MANHOLE: x SLOPE AT CONNECTIONt o.{5% METERING FACILITY PROPOSED? TYPE YES x NO ATTACHMENTS ACCOMPANYING THIS REQUEST CONTAIN: CONNECTION: PLAN SHEETS x PROFILE SHEETS x SPECIFICATIONS GENERAL: (PLEASE CIiECK) METERING FACILITY: PLAN SHEETS PROFILE SHEETS CONSTRUCTION PRINTS CONSTRUCTION SPECIFICATIONS' EQUIPMENT SPECIFICATIONS SERVICE AREA ~p REQUEST SUBMITTED BY: (INCLUDES DRAINAGE AREA, CITY BOUNDARIES, AND NAME OF DEVELOPMENT) CONTRACTING PARTY: _ Cit~o£ CoDpe]~ TRA USE ONLY POE NO. THE ABOVE POINT OF ENTRY IS HEREBY CONDITIONS: SUBJECT TO THE FOLLOWING SIGNED: ~'. / APPROVED BY: m '/' //% t.t~., · CC: NORTHERN R~'GION OFFICE DATE: DATE: L i NATHAN D. MAIER