Loading...
Riverchase(3)-CS 870227NDM NATHAN D, MAIER CONSULTING ENGINEERS, INC. February 27, 1987 Mr. Frank Trando Acting City Manager City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: 24" Water Main on MacArthur Blvd. NDM No,: 84-7-038 Dear Mr. Trando: Please find enclosed a final invoice for Jensen Construction, bid tabu- lation sheet, "Record Drawings", and City Council meeting minutes. The City Council approved reimbursement for additional cost incurred for installation of a 24" water main instead of a 12" water main. The cost difference is $134,885.98. The attached calculation sheet is for your refe- rence. Please send such amount payable to Riverchase Joint Venture at: 5420 LBJ Freeway, Suite 1370 Dallas, TX 75240 Attention: Mr. Mike Daniel If you need any additional information to process the reimbursement, please do not hesitate to call me. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. JPV/rdp Enclosures CC: Jay Patterson - Terra Land Development Mike Daniel - Terra Land Development Wayne Ginn - Ginn, Inc. Three NorthPark/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741 QUANTITY UNIT 2,585 LF ~ LF 7 TON 9 EA 9 EA CALCULATION SHEET DESCRIPTION 24" Water Main 36" Steel Encasement Cast Iron Fitting 24" Valves Valve Manholes UNIT COST )~ ~T~OT_~A_~ $ -- 53.00 $ 137,005.00 145.52 14,406.48 2,000.00 14,000.00 3,500.00 31,500.00 1,000.00 9,000.00 TOTAL $ 205,911.48 Total L_~en_gt__h of Installing 12" ~ain Instead of 24" Main QUANTITY UNIT DESCRIPTION UNIT COST 99 LF 16" Steel Encasement 114.50 1.8 TON Cast Iron Fitting 2,000.00 9 EA 12" Valves 775.00 TOTAL $ TOTAL 49,115.00 11,335.50 3,600.00 6,975.00 71,025.50 Difference in Cost: