Loading...
Peninsulas-CS 971106DEVELOPMENT FEE TABLE Project: Pennisulas of Copper (Additional 5/8" x 3/4" Irrigation Meter) Date: 11/6/97 TOTAL FEES DUE Water Impact Fee $450.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $24.14 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) I Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100 % due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100 % due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $559.14 DEVELOPMENT FEE WORKSHE=T PROJECT: DATE: Pennisulas of Coppell Additional 5/8" x 3/4" Irrigation Meter 11/6/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): I - 5/8 inch X 3/4 inch Fireline Meter(s): Total #: I ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: I Connections @ ~50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 0 Domestic Meter(s) @ (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $24.14 Water Meter Deposit Fee (Domestic): Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' @$450,00 ea. Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's I ESU's ESU's ESU's ~450.00 $50.00 $0.00 $24.14 $0.00 $0.00 $0,00 ~35.00 $0.00 $0.00 $0.00 Page 1 DEVELOPMENT FEE WORKSHE=T Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ 9150.00 / Lot Multi-family @ 975.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ 9350.00 / Lot Multi-family @ 9350.00 / Unit {50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ 91285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, 9292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A 90.00 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 INSTALL: ', I- 2' BLOWtOFF VALVE IN METER 1~3X BEHIND CURB, W/LID I' 12 ST.A:', 10+95.00 LINE 'A' CONSTRU.CT 4' DIA MANHOLE 15 L: 8" ~fAi'ER