Peninsulas-CS 951025October 25, 1995
Mr. Tim House
5220 Spring Valley//500
Dallas, Texas 75240
FAX 9~
RE:
1 ~elease
Coppell,
Texas 75019
P.O. Box 478
Coppell, Texas 75019
214-462-0022
nUBLIC WORKS
Dear Mr. House:
A final inspection of paving and utilities for the referenced project has been conducted by
representatives of the City of Coppell.
The two-year maintenance bond on paving, utility construction and as-built drawings have been
received. Maturity on the bonds will be two years from the date of this letter. However, the
following items need to be resolved: 1) provide erosion control maintenance bond; 2) provide
verification of the 1% slope grading between Lots 19, 20 & 21, Block B and Lots 10, 11, 12,
16 , 17, 18, Block B in lieu of constructing the concrete swales referenced on sheet 5 of the
construction plans; and 3) resolve the issue regarding the ingress/egress for the subdivision of
East and West Peninsula Drive at MacArthur Blvd. Before a final acceptance letter can be
issued for Peninsulas of Coppell the outstanding issues must be resolved.
If I can be of any further assistance please contact me at 304-3684.
Sincerely,
Construction Inspector
CC:
Kenneth M. Griffin, P.E., Asst. City Manager/City Engineer
Howard Pafford, Utilities Superintendent
Per Birdsall, Interim Street Superintendent
Greg Jones, Chief Building Official
Jeff Jones, Fire Marshal
Doug Stevens, Engineering Technician
Terry Mitchell, Carter & Burgess