Peninsulas-CS 951005EN~'rNEER'fNG DIVISION
I~EHOI~U~
DATE:
TO:
FROM:
RE:
October 5, ~995
Larry Davis, Construction Inspector
Howard Pafford, Utilities Superintendent
Off Site Sewer Line for Peninsulas of Coppell
A walk thru was conducted on October 5, 1995, for the above
referenced project. The following items were found to be
deficient.
1. Need steel straps installed on crossing.
Erosion protection on creek banks needs to be
installed. (ie, rip-rap or wire tied crush stone).
If you have any questions, please give me a call.
HLP/dg
To:
From:
RE:
Howard Pafford, Utilities Superintendent
WALK-THRU of off ~ite sanitary sewer for 1~'- |nnul~ of Coppell
Dat~: October 3, 1995
A walk-thru for the off site sanitary sewer for the referenced project has been schcdulexl for
Thursday, October 5, 1995 at 1:30 p.m.
If I can b~ of further assistance pleaae let me know.
Tim House Fax g980-2421
Truman Edminster Fax #638-0447
Bub Murray Fax # 219-0019
ftle/ldav~0walkduu.mm