Loading...
Peninsulas-CS 951005EN~'rNEER'fNG DIVISION I~EHOI~U~ DATE: TO: FROM: RE: October 5, ~995 Larry Davis, Construction Inspector Howard Pafford, Utilities Superintendent Off Site Sewer Line for Peninsulas of Coppell A walk thru was conducted on October 5, 1995, for the above referenced project. The following items were found to be deficient. 1. Need steel straps installed on crossing. Erosion protection on creek banks needs to be installed. (ie, rip-rap or wire tied crush stone). If you have any questions, please give me a call. HLP/dg To: From: RE: Howard Pafford, Utilities Superintendent WALK-THRU of off ~ite sanitary sewer for 1~'- |nnul~ of Coppell Dat~: October 3, 1995 A walk-thru for the off site sanitary sewer for the referenced project has been schcdulexl for Thursday, October 5, 1995 at 1:30 p.m. If I can b~ of further assistance pleaae let me know. Tim House Fax g980-2421 Truman Edminster Fax #638-0447 Bub Murray Fax # 219-0019 ftle/ldav~0walkduu.mm ~0~ 9~£'0N ~3±N3D 33IA~BS ~ ~NI~33NI~NB 993dd03 ~0 AlI3 P£:~