Loading...
Peninsulas-CS 950929COPPELL ENGINEERING DEPARTMENT MEMORANDUM DATE: TO: FROM: RE: Septeraber 29, 1995 Larry Davis, Const. Inspector Howard Pafford, Utilities Superintendent Follow-Up Water/Sewer Walk Through for Peninsulas of Coppell A follow up walk-thru was conducted on the above referenced project. As of September 29, 1995 all punchlist items were corrected. Please ensure that the off-site sewer line is accepted prior to final acceptance of the subdivision. If you have any questions regarding this matter, please advise. HLP/dg