Peninsulas-CS 950929COPPELL ENGINEERING DEPARTMENT
MEMORANDUM
DATE:
TO:
FROM:
RE:
Septeraber 29, 1995
Larry Davis, Const. Inspector
Howard Pafford, Utilities Superintendent
Follow-Up Water/Sewer Walk Through for Peninsulas
of Coppell
A follow up walk-thru was conducted on the above referenced
project. As of September 29, 1995 all punchlist items were
corrected.
Please ensure that the off-site sewer line is accepted prior to
final acceptance of the subdivision.
If you have any questions regarding this matter, please advise.
HLP/dg