Peninsulas-CS 950928COPPRr3. U~ILITIES MEMORANDUM DATE: TO: FROM: RE: September 28, 1995 Larry Davis, Construction Inspector Howard Pafford, Utilities Superintendent Final Water/Sewer Walk Through for Peninsulas of Coppell A final walk thru was conducted on September referenced project. The following items were deficient. 28, on the above found to be Manhole at east Peninsulas Drive and MacArthur needs external chimney seal, install or repour manhole with the proper neck to allow chimney seal to fit on inside. Can call chilton & associates of Dallas for assistance in installing bridge for internal chimney seal. 2. Lot 32 meter can busted. 3. Lot 32 dirt and concrete in bottom of manhole 4004. 4e Manhole 4001 on west Peninsulas Drive. Dirt in the bottom of invert and no chimney seal. 5. Manhole at 4002 needs dirt cleaned out of bottom. HLP/dg DATE: TO: FROM: RE: ' ~ COPPELL PUBLIC WORKS MEMOR/tNDUM August 16, 1995 \~ Larry Davis, Const. Inspector ~ ~ Howard Pafford, Utilities Superintenden~ Final Water/Sewer Walk Through for Peninsu.[s of Coppell A walk-thru was conducted on the above referenced project and the following items were found to be deficient. Lot 18 j~Lot 23 Lot 20 Ail manholes need to be checked after off-site sewer line installed. (Line in subdivision has water in it over inverts). All 4-2" blowoffs need close nipples and elbows. needs sweep Tee on lot clean out replaced. no water to service. and 21 needs concrete pads repoured around lot cleanouts. Lot 7 needs white sewer pipe replaced with green SDR 35 sewer pipe in clean out. Manhole at east Peninsulas Drive and MacArthur needs ~ external chimney seal,install or repour manhole with the ~ proper neck to allow chimney seal to fit on inside. Can ) call Chilton & associates of Dallas for assistance in / ~talling bridge for internal chimney seal. ~ /._:> ::, - .. ... To: From: RE: Date: Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Jeff Jones, Fire Marshal Greg Jones, Chief Building Official Davis, Construction Inspect4~/ FINAL WALK-THRU f6r Peninsulas of Coppell PUBLIC WORKS August 10, 1995 A final walk-thru for the referenced project has been scheduled for 'l'uesday, August 15, 1995 at 8:30 a.m. If I can be of further assistance please let me know. CC: XIT Paving Murray Construction Tim House file/ldavis/Owalkthm.mm <:to=e ,o',??/o.s ~ WLb,,,.,.,$. :Sero ,c ~o 4,)