Peninsulas-CS 950928COPPRr3. U~ILITIES
MEMORANDUM
DATE:
TO:
FROM:
RE:
September 28, 1995
Larry Davis, Construction Inspector
Howard Pafford, Utilities Superintendent
Final Water/Sewer Walk Through for Peninsulas of
Coppell
A final walk thru was conducted on September
referenced project. The following items were
deficient.
28, on the above
found to be
Manhole at east Peninsulas Drive and MacArthur needs
external chimney seal, install or repour manhole with the
proper neck to allow chimney seal to fit on inside. Can
call chilton & associates of Dallas for assistance in
installing bridge for internal chimney seal.
2. Lot 32 meter can busted.
3. Lot 32 dirt and concrete in bottom of manhole 4004.
4e
Manhole 4001 on west Peninsulas Drive. Dirt in the
bottom of invert and no chimney seal.
5. Manhole at 4002 needs dirt cleaned out of bottom.
HLP/dg
DATE:
TO:
FROM:
RE:
' ~ COPPELL PUBLIC WORKS
MEMOR/tNDUM
August 16, 1995 \~
Larry Davis, Const. Inspector ~ ~
Howard Pafford, Utilities Superintenden~
Final Water/Sewer Walk Through for Peninsu.[s
of Coppell
A walk-thru was conducted on the above referenced project and the
following items were found to be deficient.
Lot 18
j~Lot 23
Lot 20
Ail manholes need to be checked after off-site sewer line
installed. (Line in subdivision has water in it over
inverts).
All 4-2" blowoffs need close nipples and elbows.
needs sweep Tee on lot clean out replaced.
no water to service.
and 21 needs concrete pads repoured around lot
cleanouts.
Lot 7 needs white sewer pipe replaced with green SDR 35
sewer pipe in clean out.
Manhole at east Peninsulas Drive and MacArthur needs ~
external chimney seal,install or repour manhole with the ~
proper neck to allow chimney seal to fit on inside. Can )
call Chilton & associates of Dallas for assistance in /
~talling bridge for internal chimney seal. ~
/._:> ::, - .. ...
To:
From:
RE:
Date:
Howard Pafford, Utilities Superintendent
Rey Gonzales, Street Superintendent
Jeff Jones, Fire Marshal
Greg Jones, Chief Building Official
Davis, Construction Inspect4~/
FINAL WALK-THRU f6r Peninsulas of Coppell
PUBLIC WORKS
August 10, 1995
A final walk-thru for the referenced project has been scheduled for 'l'uesday, August 15, 1995
at 8:30 a.m.
If I can be of further assistance please let me know.
CC:
XIT Paving
Murray Construction
Tim House
file/ldavis/Owalkthm.mm