Peninsulas-CS 950310COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
March 10, 1995
Mike Martin
Howard Pafford
Development Fees for MacArthur Park
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
50 - 5/8"x 3/4" Domestic Meter/s = 50 ESU's
2 - 2" Irrigation Meter/s = 16 ESU's
Total 66 ESU's @ $450.00 ea = $29,700.00
100% due prior to Council approval of the final plat.
Wastewater Impact
50 - 5/8" x 3/4" Domestic Meter/s =
Total 50 ESU's ~ $450.00 ea =
50 ESU's
$22,500.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
52 Connections ~ $100.00 each = $5,200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
50 Connections @ $100.00 each = $5,000.00
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
50 lots ~ $50.00/lot = $2,500.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
50 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = S1.112.50
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee
2 - 2"
(Irrigation/Fireline)
Irrigation Meter/s @ $173.65 ea
Fireline Meter/s @ $ ea
100% due prior to issuance of water meter/s.
= $247.30
=
Water Meter Deposit (Residential)
50 Meters @ $ 30.00 ea = $1,500.00
100% due prior to issuance of building permit.
Irrigation Meter Deposit
2 Meters @ $35.00 ea = $70.00
100% due prior to issuance of water meters.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval after June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each = $
units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
50 Residential Lots at $1,285.00 each = $64.250.00
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Development Fees
Page 4
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 5
STREET SIGN ASsEsSMENT
for MacArthur Park
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis,
SIGN UNIT PRICE QUANTITY
No Parking $53.10
Speed Limit $63.54
Yield $58.56 1
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85 3
OTHER
No outlets 11.60 3
EXTENDED PRICE
58.56
290.55
34.80
* Cost breakdowns may be
request.
TOTAL
obtained from
Public
$383.91
Works by written
DEVFEES.HLP Revised 1/14/94