Loading...
Peninsulas-PT 950906Bor~/Excava=ion in Pu~lig Righ=-Of-Way Perm/= City of Coppe!! - Public Works Department Permit Issued To: Name: Add=ess: Phone: ~mergen~ Phone: ~/~e of work/General Descriptiom: P 0ne: Have Ail City and/or Franchise Utilities Been Contacted~/ and Zxistimq Utilities Located: YES A NO Will It Be Necessary to Excavate Street, Alley or Sidewalk ' Pavement7 Y~S (a~tach permit) NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manu.al on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of wor~. '~ Any excavation requiring closing of a street or alley must be reported =o the Police, Fire, and Public Works Depa_~T_ments prior to closing (462-1144, 462-1133 and 46~-8495). A~tach Work Order (Franchise Only) PAGE 2 PERMIT A=~ach Barricading/Detour Plan if a lane or s~reet closure is applicable. _ Franchise Inspector/or City inspec=or A~ .~r = veC~"-'- =y Re?resenna~ive Date .... App!icann shall indemnify and forever hold ha_--m.!ess againsn each and eve~! claim, demand or cause of action that may ~e made or come aqains= ;= by reason of or if any way arising out of ~he closure, blocking, excavating, cut~ing, tunneling, or other work by =he a~p!ican= under perm. i= from the City, if such pe---mit is granted. PERMIT. PHB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking p~ace. Staff will be sent to inspect the project.