RE: Princeton Park Phme II
Fee Auessment Letter
Dear Mr. Archie:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, alon~ with
a copy of the Development Fee calculations for the referenced deVelopment.
Please make payment to the City of Coppell in the amount of $2.2:~0.00 and forward to
the Finance Department along with a copy of the Fee Assessment table. This amount
reflects the deVelopment fees for a previonsly-installed 1" water meter to be used by
Princeton Park Ph~e II. Also pwvide a copy of the Engineer's estimate or conlract to our
office so the construction inspection fee can be verified.
We look forward to working with you on this project. If you have any questions, please
contact me.
Sincerely,
Kent M. Collins, P.E.
Civil Engineer
CC:
Sennifer Armstrong, Finance Director
Debbie Ingrem, Secretary
Glenn Hollowell, Assistant Director of Public Works
Gr~ Jones, Chief Buildi~ Official
Gary Sims, Director of Leisure Services .,
DEVELOPMENT FEE TABLE
Project: Princeton Park Phase H
Date: 04/19/2000
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $1,125.00 $1,125.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $56.44
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,125.00 $1,125.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100 % due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100 % due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project II
Construction Inspection Fee Information not Available
i~OTAL $2,491.44
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $2,250.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Princeton Park Phase H
DATE: 04/19/2000
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 1 inch = 2.5 ESU°s
0 = 0 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total #: 2.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $56.44
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total 0: 0 Irrigation Meter(s) @ $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
2.5
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$1,125.00
$50.00
$56.44
$o.0o
$0.00
$0.00
$35.00
$i,125.00
$50.0O
$50.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lightiag Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$0.00
$0.00
$0.00
Information not Available
Street Sign Fees:
Assessed for signage in the Ciys right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Princeton Park Phase H
04/19/2000
ROADWAY IMPACT
Service Area * 2
Category ** Office
Land Use ** General Office Bldg.
Building Area (sO 0
Development Units ** 0.00
Vehicle Miles per Development Unit ** 0
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $0.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Roadway Impact Fee Waived per Univest Agreement