Riverchase (4)-CS 920626 COPPEL~ PUBLIC WORKS
~MORANDU/,I
DAfI'E.' ~une 25, 1992 .~~- -' ~
~: Ken Griffin, C~ty Engineer ~.
Howard Pafford, Water ~~erin~dent
project.
Water Impact Fee:
161 - 5/8"x3/4"
,? - ?
Total 161
Domestic Meter/s = 161 ESU's
Irrigation Meter/s = ? ESU's
Fireline Meter/s = ESU's
ESU's @ $650.00 ea = $104,650.00
100% due prior to Council approval of final plat.
*This does not include fees for irrigation.
Wastewater Impact Fee:
161 - 5/8"x3/4" Domestic Meter/s = 161 ESU's
$72,450.00
100% due prior to Council approval of final plat.
$450.00
Water Tap Inspection Fee
161 Connections @ $100.00 each = $16.100.00.
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
161 Connections @ $100.00 each = $16,100.00.
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note= This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
park Fee
161 Residential Lots at $150.00 each = ~_~.
N/A Units (Multi family) at $75.00 each = N/A
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such ti~e as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc= Steven G. Goram, Director of Public Works
RIVRCHAS. HLP
STREET SIGN ASSESSMENT
for
Riverchase Estates
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
No Parking $53.10 -
Speed Limit $63.54 21
Yield $58.56.
Stop $65.12 -
Street Name $11.60
Stop & Street Combo $96.85 9
OTHER
No Outlet $63.54
1,334.34
871.65
TOTAL 2 20~.99
* Cost breakdowns may be obtained from Public Works by written
request.