Loading...
TR9303-CS 940622CITY OF COPPELL, TEXAS LAND USE ASSUMPTIONS FOR ROADWAY IMPACT FEES June, 1994 Leftwich & Associates Urban Planners & Engineers JBM, Engineers & Planners Dallas, Texas PURPOSE In October, 1993, the City of Coppell authorized a study to implement roadway impact fees as defined by Chapter 395 of the Texas Local Government Code. Chapter 395 requires that capital improvements accommodate new development expected to occur over a 10 year period. A land-use study has been conducted to establish demographic estimates for the base year (1994) and growth within a ten-year period (2004). As part of this study an ultimate build-out of the City of Coppell was also developed. This document defines the methodology used to establish this information. METHODOLOGY When developing this type of data several factors should be examined. The type, quantity and density of existing development, growth trends, and the availability and access of vacant land were all included the development of growth factors. Also considered was the recent zoning changes recommended by the City of Coppell Planning & Zoning and acted upon by the City Council. To establish a reliable base for growth estimates the 1990 census data was used as a starting point. The North Central Council of Governments (NCICO6) Regional Data Center recently completed their 20 year projections for population and employment within this region. This data was based on the 1990 census data and the DKAM/EMPAL models (demand driven models using employment locations, household income quartile, land use and travel time). A Demographic Methodology Task Force consisting of 10 local city planners and representatives of TxDOT, NCTCOG and DART provided review and input into the process. Final approval of this data was made by all Planning Directors wSthin the region. TRAFFIC SURVEY ZONES NC/COG established Traffic Survey Zones (TSZ) for use in their transportation model in the early 1970's. These zones are based on homogeneity ofland uses and are delineated by census tracts or natural boundaries (roadways, creeklines, raikoads, etc). For this study, TSZ served as a natural division for collection of data. TSZ's reflect the reestablished Denton/Dallas county line and recent annexation of land into the City of Coppell. SERVICE AREAS Chapter 395 dictates that a roadway service area cannot exceed three miles in diameter. All service areas conform to this requirement and relate to existing roadway facilities as shown in Figure 1. Each service areas consist of one to five TSZ 's. These service areas will be used in the development of capital improvement inventories and development of fee structures. BA SE DA TA It was determined that the above information best sewed as a basis in establishing growth rates within the City of Coppell. An annual growth rate was calculated from 1990 to 2010 (these rates are compounded annually). Tables l (Employment) and 2 (Population) illustrate growth rates for each TSZ. The projected growth rate for each TSZ was then examined for validity using the City of Coppell aerials (December 1993), the current zoning map, the City of Coppell Subdivision Development Map, and input from the Planning Department. The 1994 projections of employment and population was verified using the above method. Categories ofuses followed the c-xisting zoning ordinance: Residential ($FoED, SFo0 thru SF-I $, 9, TH-I & 2, MF-I &2, and Mit) and Nonresidential (O, R, HC, TC, LI, HI, PD, FP, SUP). Population was verified using the C~ of Coppell Engineering Department Subdivision Development Map, an inventory of existing housing and input from the Planning Director. Employment was verified using an inventory of existing development, information provided by the Planning Department, on-site review, and input from the Planning Director. GROWTH ASSUMPTIONS AND TEN-YEAR PROJECTIONS It was assumed that the City of Coppeli could accommodate future growth through increased school and inlYastructure facilities. Growth areas were identified by identifying TSZ with the highest growth factors. These area were then cross checked for available vacan! land, land uses (existing and potential development), trends of development, and accessibility (future roadway/freeway improvements). These growth estimates were reviewed for logical uniformity with the 1994 and ultimate build-out of development. Mr. Gary Seib, Planning Director again provided input as the validity of these assumptions. ULTIMATE BUILD-OUT PROJECTIONS An inventory ofvacant land was made using the City of Coppell aerials. Vacant gross acreage were coded using the zoning categories listed above and modified for recent changes made by the City Council. Roadways and landscape requirements were then subtracted from these gross acreage to reflect the amount ofdevelopable land. Floor area ratios were taken from the City's zoning ordinance and modified by the Planning Director to reflect a realistic density. Agriculture zoned tracts were not included in these calculation due to the uncertainty of future zoning. Table 3 depicts these calculations for all available vacant tracts within the city. These numbers were then added to the existing 1994 inventory to define an ultimate build-out ofthe City of Coppell. SUMMARY The 1994 existing inventory (Figure 2) shows a total of 7,060 persons employed within the city boundaries and a resident population of 21,675. These numbers conform to the estimates made by NCTCOG and the City of Coppell Planning Department. By 2004 (Figure 3) employment will increase by 60% for a total of 11,325. Population for 2004 is projected to increase approximately 3 7% for a total of 29,765. Ultimate build-out for the City of Coppell (Figure 4) shows the total capacity of employment to be 95,018 and a population of 39,064. Based on these numbers the city's ! 994 residential development is 80% built and employment is at .1245% of its capacity. 2 I I i I I ! I I I _-I 'E 0